1Roof
This area has frequent hail (higher than 84% of the country), so roofs and gutters wear faster.
Hail area

Property intelligence dossier
Owner of record: City Of Austin (100% ownership)
A commercial property on a 1.73-acre lot. We found 1 item worth attention, estimated at $367,300 – $604,950 together.
Prices on this page are for common repair and replacement work and are not a bid for a commercial-scale building. Roof type and material are read from overhead imagery and the county record, and should be confirmed on site.
This area has frequent hail (higher than 84% of the country), so roofs and gutters wear faster.
Hail area
| Roof — Roof replacement | $367,300 – $604,950 · about $4,454–$7,337/mo |
|---|---|
| Total for these items | $367,300 – $604,950 |
Roof replacement: This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
Spread over time, that is about $4,454 – $7,337 a month. Payment illustration at 7.99% APR over a 10-year term. This is arithmetic, not an offer of credit; real terms depend on a lender's approval.
Every other service for this property is priced under Full details → A.
| Roof material | Asphalt shingle |
|---|---|
| Roof area | 81,047 sq ft (810.5 squares) |
| Most common pitch | 0/12 |
| Roof sections | 39 |
| Ridges | 321 ft |
| Hips | 6 ft |
| Valleys | 516 ft |
| Eaves | 757 ft |
| Rakes | 495 ft |
| County building record | 119,644 sq ft |
|---|---|
| 3D roof planes | 42,450 sq ft |
| Range | 42,450 – 119,644 sq ft |
| Recommended system | 26 panels (10.4 kW) |
|---|---|
| Yearly production | 14,902 kWh |
| Share of this property's use | 83% |
| Yearly savings | $2,366 |
| Price | $19,750 – $26,000 |
| Pays for itself in | about 9.7 years |
| Median home value | $673,500 |
|---|---|
| Median household income | $183,808 |
| Homes lived in by their owners | 41% |
| Typical year homes were built | 2008 |
| Homes built before 1980 | 2% |
| Average household size | 1.43 |
| Median age of residents | 40.9 |
| Median rent | $3,342 |
The full neighbourhood profile is under Full details → H.
Tap anything you'd like a quote or a visit for — we'll follow up.
138 services priced for this property.
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Roofing squares | 810 squares | $367,300 – $604,950 |
|---|---|---|
| Ridge cap | 327 ft | Included |
| Drip edge | 757 ft | Included |
| Flashing | 1,531 ft | Included |
| Roof repair (leak or storm-damaged shingles) | 1 job | $340 – $1,300 |
| Roof inspection | 1 job | $130 – $340 |
| Roof softwash (algae and stain removal) | 81,047 sq ft | $24,300 – $51,850 |
| Skylight install | 1 | $1,300 – $3,450 |
| Material | Quantity | How it is worked out |
|---|---|---|
| Shingles | 2796 bundles | 932 squares ordered (810.5 measured plus 15% cutting allowance), 3 bundles per square |
| Underlayment | 82 rolls | One roll covers about 10 squares (1,000 sq ft) |
| Starter strip | 12 bundles | 1,252 ft of eave and rake edge, about 105 ft per bundle |
| Drip edge | 126 ten-foot pieces | 1,252 ft of eave and rake edge |
| Ridge and hip cap | 11 bundles | 327 ft of ridge and hip, about 30 ft per bundle |
| Valley flashing | 52 ten-foot pieces | 516 ft of valley |
Standard coverage figures with the cutting allowance shown. Confirm measurements on site before ordering.
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Ridge vent / attic ventilation upgrade | 321 ft | $3,300 – $7,050 |
|---|---|---|
| Solar attic fan | 1 | $430 – $1,050 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Gutter run (eave length) | 757 ft | $3,800 – $7,550 |
|---|---|---|
| Gutter cleaning | 757 ft | $650 – $1,300 a visit |
| Gutter guards | 757 ft | $5,300 – $13,050 |
| Underground downspout drains | 22 | $4,850 – $11,450 |
| Soffit & fascia replacement | 1,252 ft | $19,400 – $37,550 |
| Material | Quantity | How it is worked out |
|---|---|---|
| Gutter | 795 ft | 757 ft of eave plus 5% for cuts and corners |
| Downspouts | 22 | About one per 35 ft of gutter, never fewer than two |
| Hangers | 379 | One every 24 inches |
Standard coverage figures with the cutting allowance shown. Confirm measurements on site before ordering.
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Paintable wall area | 24,420 sq ft | $42,750 – $97,700 |
|---|---|---|
| Siding replacement (fiber cement) | 24,419 sq ft | $146,500 – $274,700 |
| Trim, fascia & door repaint | 1,252 ft | $2,150 – $4,400 |
| Material | Quantity | How it is worked out |
|---|---|---|
| Exterior paint, two coats | 159 gallons | One gallon covers about 350 sq ft per coat |
| Primer, if the surface is bare or new | 80 gallons | One coat at about 350 sq ft per gallon |
| Siding, if replacing | 305.6 squares | 27,786 sq ft plus 10% for cuts |
Standard coverage figures with the cutting allowance shown. Confirm measurements on site before ordering.
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Window replacement | 60 | $27,000 – $66,000 |
|---|---|---|
| Front entry door replacement | 1 | $1,300 – $3,850 |
| Patio / sliding door replacement | 1 | $1,700 – $4,750 |
| Storm door | 1 | $340 – $950 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Window screen replacement | 60 | $2,050 – $4,600 |
|---|---|---|
| Screen door | 1 | $220 – $600 |
| Solar window film | 30 | $3,900 – $9,000 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Solar system (26 panels, 10.4 kW) | 10.4 kW | $19,750 – $26,000 |
|---|---|---|
| Home battery backup option | 1 job | $8,600 – $17,200 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Flower bed mulch refresh | 3,192 sq ft | $2,200 – $4,400 |
|---|---|---|
| Bed weeding & shrub trimming | 1 job | $130 – $340 a visit |
| Leaf cleanup | 1 job | $170 – $470 a visit |
| Landscape design & planting option | 1 job | $4,300 – $17,200 |
| Pet waste removal | 1 job | $13 – $26 a visit |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Sprinkler check-up & repair | 1 job | $77 – $260 |
|---|---|---|
| Drip irrigation for beds | 1 job | $690 – $2,150 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Canopy / tree trimming | 10–20% | $300 – $770 |
|---|---|---|
| Tree removal (per tree) option | 1 | $600 – $2,150 |
| Stump grinding | 1–3 | $130 – $1,150 |
| Arborist tree health check | 1 job | $86 – $300 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Back-yard privacy fence (wood) | 400 ft | $10,000 – $16,800 |
|---|---|---|
| Fence staining & sealing | 400 ft | $1,000 – $2,400 |
| Fence repair (posts, pickets, gate) | 1 job | $260 – $1,050 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Walkway paving | 1,000–2,000 sq ft | $9,000 – $15,000 |
|---|---|---|
| Driveway sealing | 450 sq ft | $250 – $580 |
| Concrete crack & joint repair | 1 job | $220 – $770 |
| Concrete lifting & leveling (sunken slabs) | 1 job | $520 – $1,700 |
| Paver patio | 500 sq ft | $7,750 – $15,000 |
| Landscape curbing / edging | 300 ft | $2,550 – $4,650 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| New deck (composite) | 200–350 sq ft | $7,800 – $25,550 |
|---|---|---|
| Pergola | 1 job | $3,450 – $10,300 |
| Outdoor kitchen option | 1 job | $8,600 – $25,800 |
| Fire pit | 1 job | $1,300 – $4,300 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Patio cover | 400 sq ft | $10,400 – $22,400 |
|---|---|---|
| Retractable awning | 1 job | $2,150 – $5,150 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Landscape lighting | 10–18 | $1,700 – $6,100 |
|---|
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Holiday lighting (roofline) | 1,005 ft | $3,500 – $8,550 a year |
|---|
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| French drain / yard drainage | 150 ft | $3,900 – $9,000 |
|---|---|---|
| Retaining wall (block, about 3 ft tall) option | 30–60 ft | $3,000 – $15,600 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Storage shed | 1 job | $2,600 – $8,600 |
|---|
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Hot tub / spa install | 1 job | $6,000 – $15,500 |
|---|
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Foundation area | 43,219 sq ft |
|---|---|
| Foundation perimeter | 1,033 ft |
| Foundation repair, one side (about 33 piers) | 33 | $11,600 – $23,100 |
|---|---|---|
| Foundation repair, full perimeter (about 130 piers) option | 130 | $45,500 – $91,000 |
| Foundation replacement (43,219 sq ft) option | 43,219 sq ft | $594,500 – $702,500 |
| Foundation inspection (structural engineer) | 1 job | $340 – $770 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Estimated cooling capacity | 81.5 tons | $146,700 – $260,800 |
|---|---|---|
| HVAC tune-up | 1 job | $86 – $190 a visit |
| Air duct cleaning | 44,815 sq ft | $5,850 – $11,650 |
| Ductwork sealing | 44,815 sq ft | $19,250 – $38,550 |
| Smart thermostat install | 2 | $340 – $780 |
| Ductless mini-split (one zone) option | 1 job | $2,600 – $6,450 |
| Dryer vent cleaning | 1 job | $86 – $220 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Water heater replacement (tank) | 1 job | $1,200 – $2,800 |
|---|---|---|
| Tankless water heater conversion option | 1 job | $3,000 – $6,000 |
| Drain cleaning | 1 job | $130 – $390 |
| Sewer line camera inspection | 1 job | $170 – $430 |
| Sewer line replacement option | 40–80 ft | $3,100 – $17,600 |
| Whole-home repipe (PEX) | 44,815 sq ft | $100,850 – $235,300 |
| Water softener / whole-house filter | 1 job | $1,300 – $3,450 |
| Faucet & toilet upgrades | 51 | $15,300 – $35,200 |
| Leak detection | 1 job | $130 – $430 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Electrical panel upgrade (200 A) | 1 job | $1,700 – $3,850 |
|---|---|---|
| EV charger install (Level 2) | 1 job | $770 – $2,150 |
| Whole-home surge protector | 1 job | $260 – $640 |
| LED lighting & fixture upgrades | 44,815 sq ft | $28,700 – $77,100 |
| Ceiling fan install | 65 | $14,300 – $33,800 |
| Whole-home rewiring | 44,815 sq ft | $156,850 – $347,300 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Standby generator | 1 job | $7,750 – $17,200 |
|---|
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Attic insulation (blown-in) | 44,815 sq ft | $57,800 – $134,450 |
|---|---|---|
| Home energy audit | 1 job | $170 – $520 |
| Attic radiant barrier | 44,815 sq ft | $23,300 – $57,800 |
| Air sealing & weatherstripping | 1 job | $430 – $1,700 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Security system & cameras | 1 job | $690 – $2,600 |
|---|---|---|
| Smart locks & video doorbell | 1 job | $340 – $1,050 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Kitchen remodel (mid-range) | 320 sq ft | $35,200 – $80,000 |
|---|---|---|
| Kitchen refresh (cabinet refinish, counters, backsplash) option | 1 job | $7,750 – $18,900 |
| Quartz countertops | 70 sq ft | $3,650 – $8,400 |
| Cabinet painting / refacing | 1 job | $3,450 – $8,600 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Full bathroom remodel | 50 | $600,000 – $1,400,000 |
|---|---|---|
| Tub-to-shower conversion | 1 | $4,300 – $10,300 |
| Aging-in-place bath safety (grab bars, walk-in shower) | 1 job | $1,300 – $6,900 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Hardwood / luxury vinyl flooring | 26,889 sq ft | $141,150 – $322,650 |
|---|---|---|
| Bedroom carpet replacement | 9,600 sq ft | $33,600 – $67,200 |
| Tile flooring (kitchen, baths, entry) | 600 sq ft | $6,150 – $13,200 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Interior painting (walls & ceilings) | 44,815 sq ft | $100,850 – $190,450 |
|---|---|---|
| Popcorn ceiling removal | 44,815 sq ft | $57,800 – $134,450 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Custom closet systems | 32 | $41,600 – $137,600 |
|---|
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Attic bonus room (about 300 sq ft) option | 300 sq ft | $25,800 – $57,000 |
|---|
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| General pest treatment (inside & out) | 1 job | $130 – $280 |
|---|---|---|
| Quarterly pest service | 1 job | $86 – $150 a visit |
| Termite inspection | 1 job | $64 – $170 |
| Termite treatment (liquid barrier) | 1,064 ft | $5,600 – $12,750 |
| Yard fire ant & flea treatment | 1 job | $77 – $190 a visit |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Mosquito yard treatment | 1 job | $52 – $95 a visit |
|---|
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Rodent exclusion (seal entry points) | 44,815 sq ft | $9,850 – $23,300 |
|---|---|---|
| Wildlife removal (raccoons, squirrels, bats) | 1 job | $260 – $770 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| House cleaning | 44,815 sq ft | $2,700 – $4,950 a visit |
|---|---|---|
| Deep cleaning | 44,815 sq ft | $5,850 – $11,650 |
| Move-in / move-out cleaning option | 44,815 sq ft | $7,600 – $15,250 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Carpet cleaning | 65 | $2,200 – $4,500 |
|---|---|---|
| Tile & grout cleaning | 51 | $6,650 – $15,300 |
| Upholstery cleaning | 1 job | $86 – $260 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Window cleaning (inside & out) | 60 | $420 – $830 a visit |
|---|
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Wall wash area | 24,420 sq ft | $3,150 – $8,300 |
|---|---|---|
| Walkway wash area | 1,000–2,000 sq ft | $200 – $510 |
| Patio/deck wash area | 5,000–10,000 sq ft | $980 – $2,550 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Junk removal (one truckload) | 1 job | $220 – $560 |
|---|---|---|
| Dumpster rental (one week) | 1 job | $300 – $690 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Patio/deck resurfacing | 5,000–10,000 sq ft | $26,250 – $52,500 |
|---|---|---|
| Handyman half-day visit | 1 job | $240 – $450 |
| Drywall patch & repair | 1 job | $260 – $1,050 |
| Exterior caulking & weatherproofing | 1 job | $260 – $770 |
| TV mounting & furniture assembly | 1 job | $130 – $340 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Appliance repair (service call) | 1 job | $130 – $390 |
|---|---|---|
| Appliance install | 1–3 | $130 – $1,000 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Radon test | 1 job | $130 – $260 |
|---|---|---|
| Mold inspection & air quality test | 1 job | $260 – $600 |
| Whole-home inspection | 44,815 sq ft | $5,850 – $9,850 |
This estimate may be inaccurate — the building is 44,815 sq ft, well beyond the residential scale these estimates are calibrated for.
| Asbestos & lead paint testing | 1 job | $340 – $770 |
|---|---|---|
| Lead paint / asbestos abatement option | 11,204 sq ft | $78,450 – $162,450 |
| 0/12 | 77,176 sq ft | 95.2% |
|---|---|---|
| 7/12 | 3,872 sq ft | 4.8% |
| Cut & overlap allowance | Total area | Roof squares | Bundles (3/sq) |
|---|---|---|---|
| +0% (measured net) | 81,047 sq ft | 810.5 squares | 2,432 bundles |
| +5% | 85,099 sq ft | 851.0 squares | 2,553 bundles |
| +8% | 87,531 sq ft | 875.3 squares | 2,626 bundles |
| +10% | 89,152 sq ft | 891.5 squares | 2,675 bundles |
| +12% | 90,773 sq ft | 907.7 squares | 2,724 bundles |
| +15% (recommended complex) | 93,204 sq ft | 932.0 squares | 2,796 bundles |
| +20% | 97,256 sq ft | 972.6 squares | 2,918 bundles |
| Component | Quantity |
|---|---|
| Drip edge metal (eaves and rakes) | 1,252 ft (126 10-ft pieces) |
| Starter strip (eaves and rakes) | 1,252 ft (about 12 bundles) |
| Ridge cap | 321 ft (about 11 bundles) |
| Hip cap | 6 ft (about 1 bundles) |
| Valley flashing | 516 ft (52 10-ft pieces) |
| Roof material | Asphalt shingle |
|---|---|
| Roof area | 81,047 sq ft (810.5 squares) |
| Most common pitch | 0/12 |
| Roof sections | 39 |
| Ridges | 321 ft |
| Hips | 6 ft |
| Valleys | 516 ft |
| Eaves | 757 ft |
| Rakes | 495 ft |
| Section | Pitch | Faces | Area |
|---|---|---|---|
| Section 1 | 1/12 | W | 10,413 sq ft |
| Section 2 | 1/12 | E | 10,238 sq ft |
| Section 3 | 1/12 | E | 4,218 sq ft |
| Section 4 | 1/12 | E | 1,781 sq ft |
| Section 5 | 7/12 | SE | 1,590 sq ft |
| Section 6 | 1/12 | S | 1,529 sq ft |
| Section 7 | 1/12 | N | 1,273 sq ft |
| Section 8 | 1/12 | S | 1,248 sq ft |
| Section 9 | 1/12 | N | 1,162 sq ft |
| Section 10 | 1/12 | E | 852 sq ft |
| Section 11 | 1/12 | SE | 819 sq ft |
| Section 12 | 1/12 | SW | 681 sq ft |
| Section 13 | 1/12 | S | 597 sq ft |
| Section 14 | 1/12 | N | 589 sq ft |
| Section 15 | 7/12 | W | 549 sq ft |
| Section 16 | 7/12 | E | 542 sq ft |
| Section 17 | 1/12 | SW | 441 sq ft |
| Section 18 | 1/12 | W | 440 sq ft |
| Section 19 | 1/12 | N | 393 sq ft |
| Section 20 | 1/12 | S | 371 sq ft |
| Section 21 | 1/12 | N | 369 sq ft |
| Section 22 | 1/12 | E | 360 sq ft |
| Section 23 | 1/12 | NE | 322 sq ft |
| Section 24 | 1/12 | NE | 285 sq ft |
| Section 25 | 1/12 | S | 282 sq ft |
| Section 26 | 7/12 | SE | 234 sq ft |
| Section 27 | 1/12 | W | 219 sq ft |
| Section 28 | 1/12 | S | 200 sq ft |
| Section 29 | 1/12 | NE | 190 sq ft |
| Section 30 | 1/12 | S | 190 sq ft |
| Section 31 | 1/12 | SE | 152 sq ft |
| Section 32 | 1/12 | S | 138 sq ft |
| Section 33 | 1/12 | N | 135 sq ft |
| Section 34 | 1/12 | SW | 103 sq ft |
| Section 35 | 7/12 | S | 97 sq ft |
| Section 36 | 1/12 | NE | 95 sq ft |
| Section 37 | 7/12 | S | 83 sq ft |
| Section 38 | 1/12 | NE | 54 sq ft |
| Skylights | 1 |
|---|---|
| Also seen from above | HVAC unit |
| Most panels that fit | 1569 |
|---|---|
| Recommended system | 26 panels (10.4 kW) |
| Yearly production | 14,902 kWh |
| Sunlight on the best part of the roof | 1,684 hours a year |
| Carbon offset | 9.5 tons a year |
| Roof material | Asphalt shingle |
|---|---|
| Roof condition | Good (90/100) |
| Missing or damaged shingles | Not seen |
| Algae or moss staining | Not seen |
| Tarp or temporary repair | Not seen |
| Standing water on the roof | Not seen |
| Overflow staining | Not seen |
| Pool | No |
|---|---|
| Pool cover | No |
| Spa | No |
| Irrigation visible | No |
|---|---|
| Dead trees | Not seen |
| Plants against the house | Not seen |
| Bare dirt patches | Not seen |
| Overgrown areas | Not seen |
| Trees over the roof | Not seen |
| Trampoline | No |
| Boat or RV | No |
| Yard debris | Not seen |
| Fence | No |
|---|
| Walkway condition | Good (100/100) |
|---|---|
| Retaining wall condition | Good (100/100) |
| Solar panels | No |
|---|
| Owner of record | City Of Austin (100% ownership) |
|---|---|
| Owner since | April 1974 |
| Homestead exemption | Not claimed |
| County value (2026) | $126,326,144 |
| Land value | $90,223,200 |
| Building value | $36,102,944 |
| Land use | Commercial Improved |
| Main floor built | 2004 |
| County parcel ID | 192779 |
| Recorded acreage | 1.7260 acres |
| Recorded improvement value | $34,593,805 |
| Recorded land value | $78,193,440 |
| Recorded subdivision | BLOCK 003 ORIGINAL CITY |
| Legal description | BLOCK 003 ORIGINAL CITY LESS SE & SW TRI |
Outline and dimensions as the county has them on file, in feet. It is a footprint drawing, not a floor plan, and it carries no compass direction. The buildings are shown side by side, not where they sit on the lot.
| Lot size | 1.73 acres |
|---|---|
| Lot perimeter | 1,074 ft |
| Building outline | 79,894 sq ft |
| Foundation area | 43,219 sq ft |
| Walkway paving | 1,000–2,000 sq ft |
| Patio/deck resurfacing | 5,000–10,000 sq ft |
| Walkway wash area | 1,000–2,000 sq ft |
| Patio/deck wash area | 5,000–10,000 sq ft |
| Canopy / tree trimming | 10–20% |
| Building footprint | 44,815 sq ft |
| Flood zone | Zone X (outside the high-risk flood area) |
|---|
| Overall disaster risk for this area | Relatively Moderate |
|---|---|
| Overall disaster risk percentile (state) | 62nd |
| How vulnerable the community is to disaster impact | Very Low |
| How well the community recovers from disasters | Relatively High |
| Cold wave | Relatively Low, 28th percentile, about 0.632 events a year |
|---|---|
| Earthquake | Very Low, 5th percentile |
| Hail | Relatively Moderate, 84th percentile, about 3.9 events a year |
| Heat wave | Relatively Moderate, 59th percentile, about 10.3 events a year |
| Hurricane | Very Low, 45th percentile, about 0.035 events a year |
| Ice storm | Very Low, 20th percentile, about 0.551 events a year |
| Landslide | Very Low, 17th percentile |
| Lightning | Relatively Low, 24th percentile, about 49.5 events a year |
| Inland flooding | Relatively High, 87th percentile, about 5.5 events a year |
| Strong wind | Relatively Low, 32nd percentile, about 1.6 events a year |
| Tornado | Relatively High, 75th percentile |
| Winter weather | Relatively Low, 26th percentile, about 3.8 events a year |
| Cold wave | $90 |
|---|---|
| Earthquake | $769 |
| Hail | $81,022 |
| Heat wave | $1 |
| Hurricane | $4,965 |
| Ice storm | $1,762 |
| Lightning | $371 |
| Inland flooding | $638,192 |
| Strong wind | $7,702 |
| Tornado | $65,831 |
| Winter weather | $210 |
| Flood zone | X |
|---|---|
| Flood zone description | 0.2 Pct Annual Chance Flood Hazard |
| In a high-risk federal flood zone | No |
| Flood map current as of | Jan 22, 2020 |
| Severe Storms, Straight-Line Winds, and Flooding | Jul 6, 2025 — Public Assistance, Individuals and Households |
|---|---|
| Severe Winter Storm | Apr 21, 2023 — Public Assistance, Hazard Mitigation |
| Severe Winter Storms | Feb 19, 2021 — Public Assistance, Hazard Mitigation, Individuals and Households |
| Severe Winter Storm | Feb 14, 2021 — Public Assistance |
| Tropical Storms Marco and Laura | Aug 24, 2020 — Public Assistance |
| Covid-19 Pandemic | Mar 25, 2020 — Public Assistance, Hazard Mitigation, Individuals and Households |
| COVID-19 | Mar 13, 2020 — Public Assistance |
| Severe Storms and Flooding | Feb 25, 2019 — Public Assistance, Hazard Mitigation |
| Hurricane Harvey | Aug 25, 2017 — Public Assistance, Hazard Mitigation |
| Severe Storms and Flooding | Jun 11, 2016 — Public Assistance, Hazard Mitigation, Individuals and Households |
| Severe Storms, Tornadoes, Straight-Line Winds, and Flooding | Nov 25, 2015 — Public Assistance, Hazard Mitigation, Individuals and Households |
| Severe Storms, Tornadoes, Straight-Line Winds and Flooding | May 29, 2015 — Public Assistance, Hazard Mitigation, Individuals and Households |
| Severe Storms and Flooding | Dec 20, 2013 — Public Assistance, Hazard Mitigation |
| WILDFIRES | Sep 9, 2011 — Hazard Mitigation, Individuals and Households |
| Steiner Ranch Fire | Sep 5, 2011 — Public Assistance |
| Soil type | Urban land, 0 to 6 percent slopes |
|---|---|
| How fast rain runs off this soil | Very high |
| Ground slope | 3% |
| Septic system suitability | Very limited |
| Radon potential for this area | Low (average indoor levels less than 2 pCi/L) |
|---|---|
| Testing recommended | Yes — every home, in every zone |
| Violent crime reported to the local police department in 2025 | 4,221 |
|---|---|
| Violent crime rate | 4.2 per 1,000 residents |
| Property crime reported to the local police department in 2025 | 31,011 |
| Property crime rate | 31 per 1,000 residents |
| Elevation above sea level | 464 ft |
|---|
| Radar-estimated hail of 1 inch or larger within 1 mile (Oct 14, 2020 to Oct 11, 2026) | 1 day |
|---|---|
| ...within 3 miles | 8 days |
| Largest radar estimate within 1 mile | 2.72 in (tennis ball), May 28, 2025 |
| Most recent radar estimate within 1 mile | 2.72 in (tennis ball), May 28, 2025 |
| Hail of 1 inch or larger reported within 10 miles (2017 to now) | 68 reports |
| ...of those, within 3 miles | 9 |
| Largest hail reported | 3 in (teacup), Sep 24, 2023, 5.4 miles away |
| Most recent hail of 1 inch or larger | 1 in (quarter), Apr 30, 2026, 4.4 miles away |
| Wind gusts of 58 mph or stronger within 10 miles (2017 to now) | 14 reports |
| Strongest gust reported | 74 mph gust, May 28, 2025, 3.2 miles away |
| Tornadoes that passed within 10 miles (since 1950) | 34 |
| Closest tornado path | rated F1, Nov 15, 2001, under a mile away |
| Date | Largest radar estimate | Distance |
|---|---|---|
| Apr 30, 2026 | 1.15 in (quarter) | 2.2 miles |
| May 28, 2025 | 4.04 in (grapefruit) | 2.0 miles |
| May 6, 2025 | 1.25 in (half dollar) | 2.5 miles |
| Mar 23, 2025 | 1.22 in (quarter) | 1.7 miles |
| Aug 4, 2024 | 1.04 in (quarter) | 2.0 miles |
| Sep 24, 2023 | 2.04 in (hen egg) | 2.8 miles |
| Mar 1, 2022 | 1.44 in (half dollar) | 1.2 miles |
| Mar 24, 2021 | 1.2 in (quarter) | 2.2 miles |
Radar estimates hail size from above and can read high or low. It shows where large hail likely fell, not whether a roof was damaged.
| Year | Hail of 1 in or larger | Largest hail | Strong wind gusts | Tornadoes |
|---|---|---|---|---|
| 2026 | 2 | 1 in (quarter) | 2 | 0 |
| 2025 | 2 | 1 in (quarter) | 2 | 0 |
| 2024 | 17 | 2.5 in (tennis ball) | 4 | 0 |
| 2023 | 26 | 3 in (teacup) | 0 | 0 |
| 2022 | 1 | 1 in (quarter) | 0 | 0 |
| 2021 | 8 | 2 in (hen egg) | 1 | 0 |
| 2020 | 7 | 1.75 in (golf ball) | 1 | 0 |
| 2019 | 0 | 3 | 0 | |
| 2018 | 0 | 1 | 0 | |
| 2017 | 5 | 1.5 in (ping pong ball) | 0 | 0 |
| Date | Type | Size or speed | Distance |
|---|---|---|---|
| Aug 27, 2026 | Strong wind | 60 mph | 8.1 miles |
| May 19, 2026 | Strong wind | 60 mph | 7.7 miles |
| Apr 30, 2026 | Hail | 1 in (quarter) | 4.4 miles |
| Apr 30, 2026 | Hail | 1 in (quarter) | 3.9 miles |
| May 28, 2025 | Hail | 1 in (quarter) | 5.1 miles |
| May 28, 2025 | Hail | 1 in (quarter) | 6.8 miles |
| May 28, 2025 | Strong wind | 74 mph | 3.2 miles |
| May 28, 2025 | Strong wind | 65 mph | 9.0 miles |
| May 16, 2024 | Strong wind | 61 mph | 9.1 miles |
| Apr 28, 2024 | Strong wind | 61 mph | 5.5 miles |
| Apr 28, 2024 | Strong wind | 61 mph | 4.5 miles |
| Apr 28, 2024 | Strong wind | 61 mph | 4.8 miles |
| Apr 9, 2024 | Hail | 1.25 in (half dollar) | 9.9 miles |
| Apr 9, 2024 | Hail | 1 in (quarter) | 7.1 miles |
These are individual storm reports filed near this address. Storms are narrow, so a report nearby does not mean this roof was hit; an inspection is how you confirm. Hail of 1 inch or larger can crack or bruise asphalt shingles, and most insurance policies set a time limit for filing a storm claim, so check yours.
| Median home value in the area | $673,500 |
|---|---|
| Median household income in the area | $183,808 |
| Homes owned by their occupants | 40.8% |
| Homes rented by their occupants | 59.2% |
| Median monthly rent in the area | $3,342 |
| Average household size | 1.43 |
| Median age in the area | 40.9 |
| Total homes in the area | 3,089 |
| Vacant homes | 10.9% |
| Homes built before 1980 | 1.8% |
| Estimated median year homes were built in the area | 2008 |
| City / place | Austin city |
|---|---|
| County | Travis County |
| State | Texas |
| Urban area | Austin, TX Urban Area |
| School district | Austin Independent School District |
| State senate district | State Senate District 14 |
| State house district | State House District 49 |
| Congressional district | Congressional District 10 |
| Total households | 2,752 |
|---|---|
| Married-couple household | 744 (27%) |
| Married-couple household, with children under 18 | 0 (0%) |
| Cohabiting couple household | 301 (10.9%) |
| Cohabiting couple household, with children under 18 | 0 (0%) |
| Male householder living without a partner | 1,172 (42.6%) |
| Male householder living without a partner, with children under 18 | 0 (0%) |
| Male householder living without a partner, householder living alone | 1,137 (41.3%) |
| Male householder living without a partner, householder living alone, 65 years and over | 60 (2.2%) |
| Female householder living without a partner | 535 (19.4%) |
| Female householder living without a partner, with children under 18 | 0 (0%) |
| Female householder living without a partner, householder living alone | 511 (18.6%) |
| Female householder living without a partner, householder living alone, 65 years and over | 30 (1.1%) |
| Households with one or more people under 18 | 0 (0%) |
| Households with one or more people 65 years and over | 215 (7.8%) |
| Average household size | 1.43 |
| Average family size | 2.06 |
| Population in households | 3,923 |
|---|---|
| Householder | 2,752 (70.2%) |
| Spouse | 653 (16.6%) |
| Unmarried partner | 322 (8.2%) |
| Child | 116 (3%) |
| Other relatives | 80 (2%) |
| Other nonrelatives | 0 (0%) |
| Males 15 years and over | 2,222 |
|---|---|
| Males 15 years and over, never married | 1,212 (54.5%) |
| Males 15 years and over, now married, except separated | 816 (36.7%) |
| Males 15 years and over, separated | 33 (1.5%) |
| Males 15 years and over, widowed | 0 (0%) |
| Males 15 years and over, divorced | 161 (7.2%) |
| Females 15 years and over | 1,701 |
| Females 15 years and over, never married | 938 (55.1%) |
| Females 15 years and over, now married, except separated | 705 (41.4%) |
| Females 15 years and over, separated | 0 (0%) |
| Females 15 years and over, widowed | 0 (0%) |
| Females 15 years and over, divorced | 58 (3.4%) |
| Number of women 15 to 50 years old who had a birth in the past 12 months | 0 (0%) |
|---|
| Number of grandparents living with own grandchildren under 18 | 0 (0%) |
|---|---|
| Number of grandparents responsible for own grandchildren under 18 | 0 (0%) |
| Population 3 years and over enrolled in school | 156 |
|---|---|
| Nursery school, preschool | 0 (0%) |
| Kindergarten | 0 (0%) |
| Elementary school (grades 1-8) | 0 (0%) |
| High school (grades 9-12) | 0 (0%) |
| College or graduate school | 156 (100%) |
| Population 25 years and over | 3,704 |
|---|---|
| Less than 9th grade | 0 (0%) |
| 9th to 12th grade, no diploma | 52 (1.4%) |
| High school graduate (includes equivalency) | 54 (1.5%) |
| Some college, no degree | 367 (9.9%) |
| Associate's degree | 126 (3.4%) |
| Bachelor's degree | 1,827 (49.3%) |
| Graduate or professional degree | 1,278 (34.5%) |
| High school graduate or higher | 3,652 (98.6%) |
| Bachelor's degree or higher | 3,105 (83.8%) |
| Civilian population 18 years and over | 3,923 |
|---|---|
| Civilian veterans | 78 (2%) |
| Total Civilian Noninstitutionalized Population | 3,923 |
|---|---|
| With a disability | 250 (6.4%) |
| under 18 | 0 (0%) |
| 18 to 64 years | 3,608 |
| 18 to 64 years, with a disability | 168 (4.7%) |
| 65 years and over | 315 |
| 65 years and over, with a disability | 82 (26%) |
| Population 1 year and over | 3,923 |
|---|---|
| Same house | 2,683 (68.4%) |
| Different house (in the U.S. or abroad) | 1,240 (31.6%) |
| Different house (in the U.S. or abroad), different house in the U.S. | 1,039 (26.5%) |
| Different house (in the U.S. or abroad), different house in the U.S., same county | 563 (14.4%) |
| Different house (in the U.S. or abroad), different house in the U.S., different county | 476 (12.1%) |
| Different house (in the U.S. or abroad), different house in the U.S., different county, same state | 164 (4.2%) |
| Different house (in the U.S. or abroad), different house in the U.S., different county, different state | 312 (8%) |
| Different house (in the U.S. or abroad), abroad | 201 (5.1%) |
| Total population | 3,923 |
|---|---|
| Native | 3,374 (86%) |
| Native, born in United States | 3,285 (83.7%) |
| Native, born in United States, state of residence | 1,367 (34.8%) |
| Native, born in United States, different state | 1,918 (48.9%) |
| Native, born in Puerto Rico, U.S. Island areas, or born abroad to American parent(s) | 89 (2.3%) |
| Foreign-born | 549 (14%) |
| Foreign-born population | 549 |
|---|---|
| Foreign-born population, naturalized U.S. citizen | 104 (18.9%) |
| Foreign-born population, not a U.S. citizen | 445 (81.1%) |
| Population born outside the United States | 638 |
|---|---|
| Native | 89 (89%) |
| Native, entered 2010 or later | 0 (0%) |
| Native, entered before 2010 | 89 (100%) |
| Foreign-born | 549 |
| Foreign-born, entered 2010 or later | 347 (63.2%) |
| Foreign-born, entered before 2010 | 202 (36.8%) |
| Foreign-born population, excluding population born at sea | 549 |
|---|---|
| Foreign-born population, excluding population born at sea, europe | 276 (50.3%) |
| Foreign-born population, excluding population born at sea, asia | 167 (30.4%) |
| Foreign-born population, excluding population born at sea, africa | 0 (0%) |
| Foreign-born population, excluding population born at sea, oceania | 0 (0%) |
| Foreign-born population, excluding population born at sea, latin America | 106 (19.3%) |
| Foreign-born population, excluding population born at sea, northern America | 0 (0%) |
| Population 5 years and over | 3,923 |
|---|---|
| English only | 3,265 (83.2%) |
| Language other than English | 658 (16.8%) |
| Language other than English, speak English less than "very well" | 78 (2%) |
| Spanish | 158 (4%) |
| Spanish, speak English less than "very well" | 52 (1.3%) |
| Other Indo-European languages | 374 (9.5%) |
| Other Indo-European languages, speak English less than "very well" | 26 (0.7%) |
| Asian and Pacific Islander languages | 51 (1.3%) |
| Asian and Pacific Islander languages, speak English less than "very well" | 0 (0%) |
| Other languages | 75 (1.9%) |
| Other languages, speak English less than "very well" | 0 (0%) |
| Total population | 3,923 |
|---|---|
| American | 28 (0.7%) |
| Arab | 66 (1.7%) |
| Czech | 0 (0%) |
| Danish | 0 (0%) |
| Dutch | 75 (1.9%) |
| English | 955 (24.3%) |
| French (except Basque) | 35 (0.9%) |
| French Canadian | 0 (0%) |
| German | 396 (10.1%) |
| Greek | 0 (0%) |
| Hungarian | 0 (0%) |
| Irish | 583 (14.9%) |
| Italian | 195 (5%) |
| Lithuanian | 0 (0%) |
| Norwegian | 34 (0.9%) |
| Polish | 359 (9.2%) |
| Portuguese | 53 (1.4%) |
| Russian | 34 (0.9%) |
| Scotch-Irish | 0 (0%) |
| Scottish | 173 (4.4%) |
| Slovak | 0 (0%) |
| Subsaharan African | 87 (2.2%) |
| Swedish | 34 (0.9%) |
| Swiss | 0 (0%) |
| Ukrainian | 34 (0.9%) |
| Welsh | 0 (0%) |
| West Indian (excluding Hispanic origin groups) | 0 (0%) |
| Total households | 2,752 |
|---|---|
| With a computer | 2,752 (100%) |
| With a broadband Internet subscription | 2,598 (94.4%) |
| Population 16 years and over | 3,923 |
|---|---|
| In labor force | 3,254 (82.9%) |
| In labor force, civilian labor force | 3,254 (82.9%) |
| In labor force, civilian labor force, employed | 3,254 (82.9%) |
| In labor force, civilian labor force, unemployed | 0 (0%) |
| In labor force, armed Forces | 0 (0%) |
| Not in labor force | 669 (17.1%) |
| Civilian labor force | 3,254 |
| Unemployment Rate | 0% |
| Females 16 years and over | 1,701 |
| Females 16 years and over, in labor force | 1,406 (82.7%) |
| Females 16 years and over, in labor force, civilian labor force | 1,406 (82.7%) |
| Females 16 years and over, in labor force, civilian labor force, employed | 1,406 (82.7%) |
| Own children of the householder under 6 years | 0 (0%) |
| Own children of the householder 6 to 17 years | 0 (0%) |
| Workers 16 years and over | 3,227 |
|---|---|
| Car, truck, or van -- drove alone | 851 (26.4%) |
| Car, truck, or van -- carpooled | 0 (0%) |
| Public transportation | 0 (0%) |
| Walked | 534 (16.5%) |
| Other means | 68 (2.1%) |
| Worked from home | 1,774 (55%) |
| Mean travel time to work (minutes) | 20.2 |
| Civilian employed population 16 years and over | 3,254 |
|---|---|
| Management, business, science, and arts occupations | 2,614 (80.3%) |
| Service occupations | 202 (6.2%) |
| Sales and office occupations | 408 (12.5%) |
| Natural resources, construction, and maintenance occupations | 0 (0%) |
| Production, transportation, and material moving occupations | 30 (0.9%) |
| Civilian employed population 16 years and over | 3,254 |
|---|---|
| Agriculture, forestry, fishing and hunting, and mining | 0 (0%) |
| Construction | 61 (1.9%) |
| Manufacturing | 145 (4.5%) |
| Wholesale trade | 0 (0%) |
| Retail trade | 174 (5.3%) |
| Transportation and warehousing, and utilities | 0 (0%) |
| Information | 416 (12.8%) |
| Finance and insurance, and real estate and rental and leasing | 461 (14.2%) |
| Professional, scientific, and management, and administrative and waste management services | 1,243 (38.2%) |
| Educational services, and health care and social assistance | 244 (7.5%) |
| Arts, entertainment, and recreation, and accommodation and food services | 315 (9.7%) |
| Other services, except public administration | 195 (6%) |
| Public administration | 0 (0%) |
| Civilian employed population 16 years and over | 3,254 |
|---|---|
| Private wage and salary workers | 3,045 (93.6%) |
| Government workers | 131 (4%) |
| Self-employed in own not incorporated business workers | 78 (2.4%) |
| Unpaid family workers | 0 (0%) |
| Total households | 2,752 |
|---|---|
| Less than $10,000 | 83 (3%) |
| $10,000 to $14,999 | 107 (3.9%) |
| $15,000 to $24,999 | 0 (0%) |
| $25,000 to $34,999 | 78 (2.8%) |
| $35,000 to $49,999 | 63 (2.3%) |
| $50,000 to $74,999 | 39 (1.4%) |
| $75,000 to $99,999 | 136 (4.9%) |
| $100,000 to $149,999 | 420 (15.3%) |
| $150,000 to $199,999 | 639 (23.2%) |
| $200,000 or more | 1,187 (43.1%) |
| Median household income | 183,808 |
| Mean household income | 273,193 |
| With earnings | 2,393 (87%) |
| With earnings, mean earnings | 256,006 |
| With Social Security | 211 (7.7%) |
| With Social Security, mean Social Security income | 33,953 |
| With retirement income | 57 (2.1%) |
| With Supplemental Security Income | 0 (0%) |
| With cash public assistance income | 0 (0%) |
| With Food Stamp/SNAP benefits in the past 12 months | 0 (0%) |
| Families | 803 |
| Families, less than $10,000 | 0 (0%) |
| Families, $10,000 to $14,999 | 0 (0%) |
| Families, $15,000 to $24,999 | 0 (0%) |
| Families, $25,000 to $34,999 | 28 (3.5%) |
| Families, $35,000 to $49,999 | 32 (4%) |
| Families, $50,000 to $74,999 | 0 (0%) |
| Families, $75,000 to $99,999 | 28 (3.5%) |
| Families, $100,000 to $149,999 | 61 (7.6%) |
| Families, $150,000 to $199,999 | 235 (29.3%) |
| Families, $200,000 or more | 419 (52.2%) |
| Families, median family income | 211,823 |
| Families, mean family income | 332,226 |
| Per capita income | 192,245 |
| Nonfamily households | 1,949 |
| Nonfamily households, median nonfamily income | 177,608 |
| Nonfamily households, mean nonfamily income | 248,871 |
| Median earnings for workers | 138,344 |
| Median earnings for male full-time, year-round workers | 171,857 |
| Median earnings for female full-time, year-round workers | 102,296 |
| Civilian noninstitutionalized population | 3,923 |
|---|---|
| With health insurance coverage | 3,827 (97.6%) |
| With health insurance coverage, with private health insurance | 3,665 (93.4%) |
| With health insurance coverage, with public coverage | 312 (8%) |
| No health insurance coverage | 96 (2.4%) |
| Civilian noninstitutionalized population under 19 years | 0 (0%) |
| Civilian noninstitutionalized population 19 to 64 years | 3,608 |
| In labor force: | 3,197 |
| In labor force:, employed: | 3,197 |
| In labor force:, employed:, with health insurance coverage | 3,101 (97%) |
| In labor force:, employed:, with health insurance coverage, with private health insurance | 3,072 (96.1%) |
| In labor force:, employed:, with health insurance coverage, with public coverage | 29 (0.9%) |
| In labor force:, employed:, no health insurance coverage | 96 (3%) |
| In labor force:, unemployed: | 0 (0%) |
| Not in labor force: | 411 |
| Not in labor force:, with health insurance coverage | 411 (100%) |
| Not in labor force:, with health insurance coverage, with private health insurance | 361 (87.8%) |
| Not in labor force:, with health insurance coverage, with public coverage | 50 (12.2%) |
| Not in labor force:, no health insurance coverage | 0 (0%) |
| All families | 0% |
|---|---|
| All families, married couple families | 0% |
| All families, families with female householder, no spouse present | 0% |
| All people | 5.8% |
| All people, 18 years and over | 5.8% |
| All people, 18 years and over, 18 to 64 years | 5.5% |
| All people, 18 years and over, 65 years and over | 10.2% |
| All people, people in families | 0% |
| All people, unrelated individuals 15 years and over | 10.1% |
| Total housing units | 3,089 |
|---|---|
| Occupied housing units | 2,752 (89.1%) |
| Vacant housing units | 337 (10.9%) |
| Homeowner vacancy rate | 6 |
| Total housing units | 3,089 |
|---|---|
| 1-unit, detached | 162 (5.2%) |
| 1-unit, attached | 0 (0%) |
| 2 units | 0 (0%) |
| 3 or 4 units | 0 (0%) |
| 5 to 9 units | 0 (0%) |
| 10 to 19 units | 0 (0%) |
| 20 or more units | 2,927 (94.8%) |
| Mobile home | 0 (0%) |
| Boat, RV, van, etc. | 0 (0%) |
| Total housing units | 3,089 |
|---|---|
| Built 2020 or later | 331 (10.7%) |
| Built 2010 to 2019 | 910 (29.5%) |
| Built 2000 to 2009 | 1,756 (56.8%) |
| Built 1990 to 1999 | 35 (1.1%) |
| Built 1980 to 1989 | 0 (0%) |
| Built 1970 to 1979 | 0 (0%) |
| Built 1960 to 1969 | 0 (0%) |
| Built 1950 to 1959 | 0 (0%) |
| Built 1940 to 1949 | 57 (1.8%) |
| Built 1939 or earlier | 0 (0%) |
| Total housing units | 3,089 |
|---|---|
| 1 room | 209 (6.8%) |
| 2 rooms | 1,096 (35.5%) |
| 3 rooms | 1,041 (33.7%) |
| 4 rooms | 192 (6.2%) |
| 5 rooms | 318 (10.3%) |
| 6 rooms | 86 (2.8%) |
| 7 rooms | 42 (1.4%) |
| 8 rooms | 105 (3.4%) |
| 9 rooms or more | 0 (0%) |
| Median rooms | 2.7 |
| Total housing units | 3,089 |
|---|---|
| No bedroom | 237 (7.7%) |
| 1 bedroom | 1,504 (48.7%) |
| 2 bedrooms | 1,107 (35.8%) |
| 3 bedrooms | 136 (4.4%) |
| 4 bedrooms | 105 (3.4%) |
| 5 or more bedrooms | 0 (0%) |
| Occupied housing units | 2,752 |
|---|---|
| Owner-occupied | 1,124 (40.8%) |
| Renter-occupied | 1,628 (59.2%) |
| Average household size of owner-occupied unit | 1.36 |
| Average household size of renter-occupied unit | 1.47 |
| Occupied housing units | 2,752 |
|---|---|
| Moved in 2023 or later | 490 (17.8%) |
| Moved in 2020 to 2022 | 1,102 (40%) |
| Moved in 2010 to 2019 | 925 (33.6%) |
| Moved in 2000 to 2009 | 207 (7.5%) |
| Moved in 1990 to 1999 | 0 (0%) |
| Moved in 1989 and earlier | 28 (1%) |
| Occupied housing units | 2,752 |
|---|---|
| No vehicles available | 324 (11.8%) |
| 1 vehicle available | 1,799 (65.4%) |
| 2 vehicles available | 439 (16%) |
| 3 or more vehicles available | 190 (6.9%) |
| Occupied housing units | 2,752 |
|---|---|
| Utility gas | 404 (14.7%) |
| Bottled or tank gas (propane, butane, etc.) | 80 (2.9%) |
| Electricity | 2,268 (82.4%) |
| Fuel oil, kerosene, etc. | 0 (0%) |
| Coal or coke | 0 (0%) |
| Wood | 0 (0%) |
| Solar energy | 0 (0%) |
| Other fuel | 0 (0%) |
| No fuel used | 0 (0%) |
| Occupied housing units | 2,752 |
|---|---|
| Lacking complete plumbing facilities | 0 (0%) |
| Lacking complete kitchen facilities | 0 (0%) |
| No telephone service available | 0 (0%) |
| Occupied housing units | 2,752 |
|---|---|
| 1.00 or less | 2,752 (100%) |
| 1.01 to 1.50 | 0 (0%) |
| 1.51 or more | 0 (0%) |
| Owner-occupied units | 1,124 |
|---|---|
| Less than $50,000 | 0 (0%) |
| $50,000 to $99,999 | 0 (0%) |
| $100,000 to $149,999 | 0 (0%) |
| $150,000 to $199,999 | 28 (2.5%) |
| $200,000 to $299,999 | 29 (2.6%) |
| $300,000 to $499,999 | 224 (19.9%) |
| $500,000 to $999,999 | 470 (41.8%) |
| $1,000,000 or more | 373 (33.2%) |
| Median | 673,500 |
| Owner-occupied units | 1,124 |
|---|---|
| Housing units with a mortgage | 733 (65.2%) |
| Housing units without a mortgage | 391 (34.8%) |
| Housing units with a mortgage | 733 |
|---|---|
| Less than $500 | 0 (0%) |
| $500 to $999 | 0 (0%) |
| $1,000 to $1,499 | 0 (0%) |
| $1,500 to $1,999 | 28 (3.8%) |
| $2,000 to $2,499 | 0 (0%) |
| $2,500 to $2,999 | 50 (6.8%) |
| $3,000 or more | 655 (89.4%) |
| Median | 3,423 |
| Housing units without a mortgage | 391 |
| Less than $250 | 0 (0%) |
| $250 to $399 | 0 (0%) |
| $400 to $599 | 0 (0%) |
| $600 to $799 | 0 (0%) |
| $800 to $999 | 29 (7.4%) |
| $1,000 or more | 362 (92.6%) |
| Median | 1,501 |
| Housing units with a mortgage | 681 |
|---|---|
| Less than 20.0 percent | 260 (38.2%) |
| 20.0 to 24.9 percent | 279 (41%) |
| 25.0 to 29.9 percent | 0 (0%) |
| 30.0 to 34.9 percent | 36 (5.3%) |
| 35.0 percent or more | 106 (15.6%) |
| Not computed | 52 |
| Housing unit without a mortgage | 391 |
| Housing unit without a mortgage, less than 10.0 percent | 223 (57%) |
| Housing unit without a mortgage, 10.0 to 14.9 percent | 29 (7.4%) |
| Housing unit without a mortgage, 15.0 to 19.9 percent | 28 (7.2%) |
| Housing unit without a mortgage, 20.0 to 24.9 percent | 38 (9.7%) |
| Housing unit without a mortgage, 25.0 to 29.9 percent | 0 (0%) |
| Housing unit without a mortgage, 30.0 to 34.9 percent | 0 (0%) |
| Housing unit without a mortgage, 35.0 percent or more | 73 (18.7%) |
| Occupied units paying rent | 1,628 |
|---|---|
| Less than $500 | 0 (0%) |
| $500 to $999 | 0 (0%) |
| $1,000 to $1,499 | 159 (9.8%) |
| $1,500 to $1,999 | 31 (1.9%) |
| $2,000 to $2,499 | 68 (4.2%) |
| $2,500 to $2,999 | 313 (19.2%) |
| $3,000 or more | 1,057 (64.9%) |
| Median | 3,342 |
| Occupied units paying rent | 1,628 |
|---|---|
| Less than 15.0 percent | 278 (17.1%) |
| 15.0 to 19.9 percent | 632 (38.8%) |
| 20.0 to 24.9 percent | 211 (13%) |
| 25.0 to 29.9 percent | 24 (1.5%) |
| 30.0 to 34.9 percent | 77 (4.7%) |
| 35.0 percent or more | 406 (24.9%) |
| Total population | 3,923 |
|---|---|
| Male | 2,222 (56.6%) |
| Female | 1,701 (43.4%) |
| Sex ratio (males per 100 females) | 130.6 |
| Under 5 years | 0 (0%) |
| 5 to 9 years | 0 (0%) |
| 10 to 14 years | 0 (0%) |
| 15 to 19 years | 0 (0%) |
| 20 to 24 years | 219 (5.6%) |
| 25 to 34 years | 1,263 (32.2%) |
| 35 to 44 years | 884 (22.5%) |
| 45 to 54 years | 965 (24.6%) |
| 55 to 59 years | 86 (2.2%) |
| 60 to 64 years | 191 (4.9%) |
| 65 to 74 years | 213 (5.4%) |
| 75 to 84 years | 102 (2.6%) |
| 85 years and over | 0 (0%) |
| Median age (years) | 40.9 |
| under 18 | 0 (0%) |
| 16 years and over | 3,923 (100%) |
| 18 years and over | 3,923 (100%) |
| 21 years and over | 3,923 (100%) |
| 62 years and over | 427 (10.9%) |
| 65 years and over | 315 (8%) |
| 18 years and over | 3,923 |
| 18 years and over, male | 2,222 (56.6%) |
| 18 years and over, female | 1,701 (43.4%) |
| 18 years and over, sex ratio (males per 100 females) | 130.6 |
| 65 years and over | 315 |
| 65 years and over, male | 187 (59.4%) |
| 65 years and over, female | 128 (40.6%) |
| 65 years and over, sex ratio (males per 100 females) | 146.1 |
| Total population | 3,923 |
|---|---|
| One race | 3,651 (93.1%) |
| Two or More Races | 272 (6.9%) |
| One race | 3,651 (93.1%) |
| One race, white | 3,067 (78.2%) |
| One race, white, egyptian | 0 (0%) |
| One race, white, english | 755 (19.2%) |
| One race, white, german | 148 (3.8%) |
| One race, white, irish | 165 (4.2%) |
| One race, white, italian | 80 (2%) |
| One race, white, lebanese | 0 (0%) |
| One race, white, other White | 1,919 (48.9%) |
| One race, black or African American | 0 (0%) |
| One race, black or African American, african American | 0 (0%) |
| One race, black or African American, ethiopian | 0 (0%) |
| One race, black or African American, haitian | 0 (0%) |
| One race, black or African American, jamaican | 0 (0%) |
| One race, black or African American, nigerian | 0 (0%) |
| One race, black or African American, somali | 0 (0%) |
| One race, black or African American, other Black or African American | 0 (0%) |
| One race, american Indian and Alaska Native | 43 (1.1%) |
| One race, american Indian and Alaska Native, aztec | 0 (0%) |
| One race, american Indian and Alaska Native, blackfeet Tribe of the Blackfeet Indian Reservation of Montana | 0 (0%) |
| One race, american Indian and Alaska Native, maya | 0 (0%) |
| One race, american Indian and Alaska Native, native Village of Barrow Inupiat Traditional Government | 0 (0%) |
| One race, american Indian and Alaska Native, navajo Nation | 0 (0%) |
| One race, american Indian and Alaska Native, nome Eskimo Community | 0 (0%) |
| One race, american Indian and Alaska Native, other American Indian and Alaska Native | 43 (1.1%) |
| One race, asian | 376 (9.6%) |
| One race, asian, asian Indian | 136 (3.5%) |
| One race, asian, chinese | 115 (2.9%) |
| One race, asian, filipino | 73 (1.9%) |
| One race, asian, japanese | 52 (1.3%) |
| One race, asian, korean | 0 (0%) |
| One race, asian, vietnamese | 0 (0%) |
| One race, asian, other Asian | 0 (0%) |
| One race, native Hawaiian and Other Pacific Islander | 0 (0%) |
| One race, native Hawaiian and Other Pacific Islander, chamorro | 0 (0%) |
| One race, native Hawaiian and Other Pacific Islander, native Hawaiian | 0 (0%) |
| One race, native Hawaiian and Other Pacific Islander, samoan | 0 (0%) |
| One race, native Hawaiian and Other Pacific Islander, other Native Hawaiian and Other Pacific Islander | 0 (0%) |
| One race, some Other Race | 165 (4.2%) |
| Two or More Races | 272 (6.9%) |
| Two or More Races, white and Black or African American | 53 (1.4%) |
| Two or More Races, white and American Indian and Alaska Native | 0 (0%) |
| Two or More Races, white and Asian | 0 (0%) |
| Two or More Races, white and Some Other Race | 171 (4.4%) |
| Two or More Races, black or African American and American Indian and Alaska Native | 0 (0%) |
| Two or More Races, black or African American and Some Other Race | 0 (0%) |
| Total population | 3,923 |
|---|---|
| White | 3,339 (85.1%) |
| Black or African American | 53 (1.4%) |
| American Indian and Alaska Native | 91 (2.3%) |
| Asian | 424 (10.8%) |
| Native Hawaiian and Other Pacific Islander | 0 (0%) |
| Some Other Race | 336 (8.6%) |
| Total population | 3,923 |
|---|---|
| Hispanic or Latino (of any race) | 169 (4.3%) |
| Hispanic or Latino (of any race), mexican | 76 (1.9%) |
| Hispanic or Latino (of any race), puerto Rican | 41 (1%) |
| Hispanic or Latino (of any race), cuban | 0 (0%) |
| Hispanic or Latino (of any race), other Hispanic or Latino | 52 (1.3%) |
| Not Hispanic or Latino | 3,754 (95.7%) |
| Not Hispanic or Latino, white alone | 3,067 (78.2%) |
| Not Hispanic or Latino, black or African American alone | 0 (0%) |
| Not Hispanic or Latino, american Indian and Alaska Native alone | 43 (1.1%) |
| Not Hispanic or Latino, asian alone | 324 (8.3%) |
| Not Hispanic or Latino, native Hawaiian and Other Pacific Islander alone | 0 (0%) |
| Not Hispanic or Latino, some Other Race alone | 165 (4.2%) |
| Not Hispanic or Latino, two or More Races | 155 (4%) |
| Not Hispanic or Latino, two or More Races, two races including Some Other Race | 54 (1.4%) |
| Not Hispanic or Latino, two or More Races, two races excluding Some Other Race, and three or more races | 101 (2.6%) |
| Total housing units | 3,089 |
|---|
| Citizen, 18 and over population | 3,478 |
|---|---|
| Citizen, 18 and over population, male | 1,946 (56%) |
| Citizen, 18 and over population, female | 1,532 (44%) |


Overhead photo taken: December 2023
| Recorded property value | $112,787,245 |
|---|
| Nearest weather station | 2.9 mi away |
|---|---|
| Days a year above 90°F | 121 |
| Days a year below freezing | 29 |
| Typical first freeze of the year | Nov 17 |
| Typical last freeze of the year | Mar 10 |
| Yearly heating demand (degree-days) | 1,901 |
| Yearly cooling demand (degree-days) | 2,761 |
| January | 59° / 37°F avg high/low |
|---|---|
| February | 64° / 41°F avg high/low |
| March | 73° / 48°F avg high/low |
| April | 79° / 54°F avg high/low |
| May | 86° / 63°F avg high/low |
| June | 93° / 70°F avg high/low |
| July | 96° / 72°F avg high/low |
| August | 97° / 72°F avg high/low |
| September | 91° / 66°F avg high/low |
| October | 81° / 55°F avg high/low |
| November | 71° / 46°F avg high/low |
| December | 63° / 39°F avg high/low |
| Typical electricity rate | 15.88¢ / kWh |
|---|---|
| Typical natural gas rate | $31.89 / thousand cubic feet |
| EV charging stations within 3 miles | 290 |
|---|---|
| Pie Ae City Hall Stat2 | 0 mi — 2 level 2 — ChargePoint Network |
| W Austin Residences - Tesla Destination | 0.1 mi — 1 level 2 — Tesla Destination |
| W Austin Hotel & Residences - Tesla Destination | 0.1 mi — 6 level 2 — Tesla Destination |
| Ashton Austin Station1 | 0.1 mi — 2 level 2 — ChargePoint Network |
| Ashton Austin Station3 | 0.1 mi — 2 level 2 — ChargePoint Network |
| Estimated solar output per kW installed | 1,483 kWh / year |
|---|---|
| Solar system efficiency for this location | 16.9% |
| January solar output per kW installed | 110 kWh |
| February solar output per kW installed | 97 kWh |
| March solar output per kW installed | 120 kWh |
| April solar output per kW installed | 130 kWh |
| May solar output per kW installed | 130 kWh |
| June solar output per kW installed | 132 kWh |
| July solar output per kW installed | 140 kWh |
| August solar output per kW installed | 147 kWh |
| September solar output per kW installed | 129 kWh |
| October solar output per kW installed | 129 kWh |
| November solar output per kW installed | 115 kWh |
| December solar output per kW installed | 103 kWh |
| Current air quality | Good air quality |
|---|---|
| Air quality index | 70 |
| Main pollutant | pm10 |
| Grass pollen today | Low |
|---|---|
| Tree pollen today | Moderate |
| Weed pollen today | High |
| Plants in season | Elm, Ragweed |
| Current conditions | Sunny |
|---|---|
| Current temperature | 76 F |
| Freeze expected in next 10 days | No |
| Rain in the last 24 hours | 0 in |
| Today's UV index | 7 (High) |
|---|---|
| High UV alert in effect | Yes |
| Parks & nature nearby | 20 within range -- closest: Republic Square (0.2 mi), Brent Grulke Plaza (0.2 mi), Bat viewing site (0.3 mi) |
|---|---|
| Golf courses nearby | 2 within range -- closest: Senior Golfers of America (0.4 mi), Butler Pitch & Putt (0.6 mi) |
| Water nearby | 2 within range -- closest: Waller Creek Boathouse (0.4 mi), Austin Coolers Dragonboat Team (0.4 mi) |
| Schools nearby | 20 within range -- closest: Alpha High (0.1 mi), Black Box Music Academy and Event Space (0.4 mi), Life Time (0.5 mi) |
| Hardware & home stores nearby | 20 within range -- closest: Urban Outfitters (0.1 mi), Blu Dot (0.1 mi), CVS Photo (0.3 mi) |
| Community centers nearby | 12 within range -- closest: The Ethan King Foundation, Inc. (0.2 mi), 305 South Congress (0.4 mi), Astronomic Network (0.5 mi) |
| Street-level photo available | Yes |
|---|---|
| Photo captured | 2024-03 |
| Distance from home | 92 m |
| City | Austin |
|---|
| Date | Permit no. | Type | Work | Status | Value |
|---|---|---|---|---|---|
| Dec 5, 2025 | 2025-143960 EP | Electrical Permit | This scope is limited to replace 2 each 200kw Natural Gas Fueled generators. That are part of a fully functioning Optional Standby System. No other equipment will be replaced. | Final | |
| Dec 1, 2025 | 2025-143960 PP | Plumbing Permit | This scope is limited to replace 2 each 200kw Natural Gas Fueled generators. That are part of a fully functioning Optional Standby System. No other equipment will be replaced. | Final | |
| Nov 12, 2025 | 2025-143960 BP | Building Permit | This scope is limited to replace 2 each 200kw Natural Gas Fueled generators. That are part of a fully functioning Optional Standby System. No other equipment will be replaced. | Final | |
| May 24, 2023 | 2023-052655 PP | PLUMBING PERMIT | Replace 600 gallon domestic gas water heater | FINAL | |
| May 1, 2023 | 2023-052655 BP | BUILDING PERMIT | Replace 600 gallon domestic gas water heater | EXPIRED | $181,000 |
| Jul 29, 2019 | 2019-070053 EP | ELECTRICAL PERMIT | Replace UPS to Existing Admin/Bus/Pro Office | FINAL | |
| May 8, 2019 | 2019-070053 BP | BUILDING PERMIT | Replace UPS to Existing Admin/Bus/Pro Office | EXPIRED | |
| Dec 6, 2017 | 2017-152084 EP | Electrical Permit | add new receptacle for TV in area 3160 | Final | |
| Jul 13, 2017 | 2017-085948 EP | Electrical Permit | Install 5 convenience 120 volt outlets to existing commercial. (2nd floor - council offices) | Final | |
| Jun 19, 2017 | 2017-074578 EP | Electrical Permit | Add 120 volt convenience outlet and interior lighting to exisitng commercial. | Final | |
| Jun 2, 2017 | 2017-066808 EP | Electrical Permit | Add 120 Volt 20 amp covenience outlet for tv to commecial bldg. | Final | |
| Sep 19, 2016 | 2016-114607 EP | Electrical Permit | Install (2) 20 amp 120 volt power circuits for Dynamic parking system equipment. | Final | |
| Aug 22, 2016 | 2016-101522 EP | Electrical Permit | Add switches to sensor controls on 3rd floor to existing commercial. | Final | |
| Aug 17, 2016 | 2016-097721 EP | Electrical Permit | Install outlet for TV to existing commercial only. | Final | |
| Jul 22, 2016 | 2016-086897 EP | Electrical Permit | Add lights in parking garage (level one) ONLY. | Final | |
| Jul 1, 2016 | 2016-078238 EP | Electrical Permit | Install two plugs for basement breakroom | Final | |
| Jun 2, 2016 | 2016-064335 EP | ELECTRICAL PERMIT | Add powerpack tied to existing power and occupancy censor to underground tunnel hallway to existing commercial only. | FINAL | |
| Mar 24, 2016 | 2016-032889 EP | ELECTRICAL PERMIT | Relocate disconnect for lift to commercial building. | FINAL | |
| Mar 24, 2016 | 2016-032905 EP | ELECTRICAL PERMIT | Add Submeters | FINAL | |
| Feb 1, 2016 | 2016-010265 EP | ELECTRICAL PERMIT | Add ROV 20 amp power to new IDR | FINAL | |
| Jan 11, 2016 | 2016-002663 EP | ELECTRICAL PERMIT | Relocat 1 plug and 1 cable box. | FINAL | |
| Jun 24, 2015 | 2015-076584 EP | Electrical Permit | Install power for relocated parking gates at both entrance & exit. | Final | |
| May 22, 2015 | 2015-061214 PP | Plumbing Permit | Install Backflow Preventer to Ice Machine Only at Existing Commercial Property | Final | |
| Feb 27, 2015 | 2015-018562 EP | Electrical Permit | Interior Remodel to existing Admn/Bus (Civic) Offices: Remodel Storage room into Office - 1ST FLR | Final | |
| Feb 20, 2015 | 2015-018562 BP | Building Permit | Interior Remodel to existing Admn/Bus (Civic) Offices: Remodel Storage room into Office - 1ST FLR | Final | $2,000 |
| Dec 4, 2014 | 2014-121760 MP | Mechanical Permit | Remodel to existing Admn/Bus/Prof Office to create two Storage rooms. | Final | |
| Nov 18, 2014 | 2014-121760 EP | Electrical Permit | Remodel to existing Admn/Bus/Prof Office to create two Storage rooms. | Final | |
| Nov 13, 2014 | 2014-121760 BP | Building Permit | Remodel to existing Admn/Bus/Prof Office to create two Storage rooms. | Final | $2,000 |
| Aug 8, 2014 | 2014-049482 MP | Mechanical Permit | Interior remodel to existing Civic Office. (City Hall). | Final | |
| Jul 31, 2014 | 2014-049482 EP | Electrical Permit | Interior remodel to existing Civic Office. (City Hall). | Final | |
| Jun 26, 2014 | 2014-067006 PP | Plumbing Permit | Interior Remodel to existing Civic Admn/Bus Offices ( Move a 3 drain & circulation lines on northeast side) | Final | |
| May 30, 2014 | 2014-033875 MP | Mechanical Permit | Interior Remodel to existing Civic Admn/Bus Offices | Final | |
| May 14, 2014 | 2014-049482 BP | Building Permit | Interior remodel to existing Civic Office. (City Hall). | Final | $780,870 |
| May 14, 2014 | 2014-033875 EP | Electrical Permit | Interior Remodel to existing Civic Admn/Bus Offices | Final | |
| Apr 4, 2014 | 2014-033875 BP | Building Permit | Interior Remodel to existing Civic Admn/Bus Offices | Final | $1,107,866 |
| Mar 14, 2014 | 2014-025398 PP | Plumbing Permit | replace 10 gallon water heater to existing commercial bldg | Final | |
| May 24, 2013 | 2013-054226 PP | PLUMBING PERMIT | Emergency install temp grease trap only to existing commercial building (Austin Java) | FINAL | |
| Nov 2, 2012 | 2012-110844 BP | BUILDING PERMIT | Interior Remodel to existing City Hall: Auditors Meeting Room | FINAL | $1,500 |
| Apr 26, 2012 | 2012-040785 EP | ELECTRICAL PERMIT | AWNING SIGN: Austin Rocks | FINAL | |
| Apr 26, 2012 | 2012-040786 EP | ELECTRICAL PERMIT | AWNING SIGN: Austin Rocks | FINAL | |
| Apr 26, 2012 | 2012-040787 EP | ELECTRICAL PERMIT | WALL SIGN: Austin Rocks | FINAL | |
| Jan 6, 2012 | 2011-114299 EP | ELECTRICAL PERMIT | Installing a dis-connect for recycling lift & plug for washer / dryer. | FINAL | |
| Dec 15, 2011 | 2011-112722 PP | Plumbing Permit | Add washer box to exsting comm bldg only (Loading dock area) | Final | |
| Aug 4, 2010 | 2010-067011 EP | Electrical Permit | Replacing existing garage light fixtures with new LED fixtures only | Final | |
| Feb 9, 2009 | 2009-008750 EP | ELECTRICAL PERMIT | Install Electrical Receptacle for Ice Machine to Existing Commercial Bldg. ( Room 2015 Westside Break Room) | FINAL | |
| Oct 29, 2008 | 2008-085197 PP | Plumbing Permit | Install ice machine and glass filler w/sink to 3rd floor Atrium Vending Room only (North side of bldg) | Final | |
| Aug 19, 2008 | 2007-139935 EP | Electrical Permit | INTERIOR REMODEL TO EXISTING ADMINISTRATIVE/BUSINESS | Final | |
| Aug 7, 2008 | 2008-055582 EP | Electrical Permit | INTERIOR REMODEL TO EXISTING CIVIC ADMIN/BUS OFFICE (CITY HALL) | Final | |
| Jul 17, 2008 | 2008-055582 BP | Building Permit | INTERIOR REMODEL TO EXISTING CIVIC ADMIN/BUS OFFICE (CITY HALL) | Final | $4,800 |
| Jul 17, 2008 | 2008-055582 PP | Plumbing Permit | INTERIOR REMODEL TO EXISTING CIVIC ADMIN/BUS OFFICE (CITY HALL) | Final | |
| May 22, 2008 | 2007-139939 EP | Electrical Permit | INTERIOR REMODEL TO EXPAND OFFICE AND COPY ROOM IN EXISTING ADMINISTRATIVE/BUSINESS (LAW DEPT REMODEL) | Final | |
| Sep 4, 2007 | 2007-148699 PP | Plumbing Permit | install new dedicate water supply-run 2 1/2 inch copper water line and reduce down to an 1 1/2 and tie in to existing backflow prevention for misting system | Final | |
| Aug 30, 2007 | 2007-147778 BP | Building Permit | install new dedicate water supply | Final | $22,000 |
| Aug 10, 2007 | 2007-139935 BP | Building Permit | INTERIOR REMODEL TO EXISTING ADMINISTRATIVE/BUSINESS | Final | $2,000 |
| Aug 10, 2007 | 2007-139939 BP | Building Permit | INTERIOR REMODEL TO EXPAND OFFICE AND COPY ROOM IN EXISTING ADMINISTRATIVE/BUSINESS | Final | $4,000 |
| Nov 9, 2006 | 2006-026335 PP | Plumbing Permit | Interior Remodel To Existing Administrative/Business Office | Final | $19,000 |
| Oct 25, 2006 | 2006-023390 BP | Building Permit | Interior Remodel To Existing Administrative/Business Office Remove Door & Frame Install Drywall | Final | $250 |
| Oct 19, 2006 | 2006-026335 EP | Electrical Permit | Interior Remodel To Existing Administrative/Business Office | Final | $19,000 |
| Oct 4, 2006 | 2006-026335 MP | Mechanical Permit | Interior Remodel To Existing Administrative/Business Office | Final | $19,000 |
| Jun 5, 2006 | 2006-026335 BP | Building Permit | Interior Remodel To Existing Administrative/Business Office | Final | $19,000 |
| Feb 17, 2006 | 2006-025257 EP | Electrical Permit | Freestanding Sign (North)Austin Java City Hall Cafe | VOID | |
| Jul 1, 2005 | 2005-020260 BP | Building Permit | Interior Remodel To Existing Civic Admn Svcs (City Hall): Install Exhaust Fan& Relief Vent For Plasma Monitor Room | VOID | $1,700 |
| Jul 1, 2005 | 2005-020260 MP | Mechanical Permit | Interior Remodel To Existing Civic Admn Svcs (City Hall): Install Exhaust Fan& Relief Vent For Plasma Monitor Room | VOID | $1,700 |
| May 9, 2005 | 2005-006467 BP | Building Permit | Install 5 Ton Fcu (Chilled Water) In Room 1020 For Cooling Of Audio Visual Equipment In Existing Civic Admn Svcs (City Hall) | VOID | $15,500 |
| May 9, 2005 | 2005-006467 EP | Electrical Permit | Install 5 Ton Fcu (Chilled Water) In Room 1020 For Cooling Of Audio Visual Equipment In Existing Civic Admn Svcs (City Hall) | VOID | $15,500 |
| May 9, 2005 | 2005-006467 MP | Mechanical Permit | Install 5 Ton Fcu (Chilled Water) In Room 1020 For Cooling Of Audio Visual Equipment In Existing Civic Admn Svcs (City Hall) | Final | $15,500 |
| Apr 25, 2005 | 2005-001757 BP | Building Permit | Interior Remodel To Existing Civic Admn Svcs (City Hall): Add Sound Insulation @ Council Office/Add & Conceal Fire Sprnklr Piping/Add Guardrails & Railing | Final | $280,000 |
| Feb 2, 2005 | 2004-009544 EP | Electrical Permit | Interior Remodel To Existing Civic Administrative Svcs (New City Hall): Install Precision Cooling System In Audio/Video Room (Crac) (Room 1035) | Final | $36,000 |
| Nov 17, 2004 | 2004-016999 EP | Electrical Permit | Install Elec Solar System To Exst Comm Bldg (City Hall) | Final | $11,000 |
| Oct 6, 2004 | 2004-009544 BP | Building Permit | Interior Remodel To Existing Civic Administrative Svcs (New City Hall): Install Precision Cooling System In Audio/Video Room (Crac) (Room 1035) | VOID | $36,000 |
| Oct 6, 2004 | 2004-009544 PP | Plumbing Permit | Interior Remodel To Existing Civic Administrative Svcs (New City Hall): Install Precision Cooling System In Audio/Video Room (Crac) (Room 1035) | VOID | $36,000 |
| Oct 6, 2004 | 2004-009544 MP | Mechanical Permit | Interior Remodel To Existing Civic Administrative Svcs (New City Hall): Install Precision Cooling System In Audio/Video Room (Crac) (Room 1035) | Final | $36,000 |
| Nov 12, 2003 | 2003-016323 BP | Building Permit | Finish Out Plbg Ref#03008419 | Final | |
| Nov 12, 2003 | 2003-016323 PP | Plumbing Permit | Finish Out Plbg Ref#03008419 | Final | |
| Jul 15, 2003 | 2003-018203 PP | Plumbing Permit | Temporary Construction - 6 Months Max | VOID | |
| Jul 10, 2003 | 2003-018203 BP | Building Permit | Temporary Construction - 6 Months Max | VOID | |
| Jul 10, 2003 | 2003-018203 EP | Electrical Permit | Temporary Construction - 6 Months Max | VOID | |
| Apr 1, 2002 | 2002-007605 EP | Electrical Permit | New 3-Level Parking Structure (Shell Structural Only) | VOID | $7,500,000 |
| Mar 6, 2002 | 2002-007605 MP | Mechanical Permit | New 3-Level Parking Structure (Shell Structural Only) | VOID | $7,500,000 |
| Mar 6, 2002 | 2002-007605 PP | Plumbing Permit | New 3-Level Parking Structure (Shell Structural Only) | VOID | $7,500,000 |
| Feb 5, 2002 | 2002-000624 EP | Electrical Permit | Comm Tpl Only | Final | $500 |
| Jan 22, 2002 | 2002-007605 BP | Building Permit | New 3-Level Parking Structure (Shell Structural Only) | VOID | $7,500,000 |
| Feb 12, 1998 | 1998-000659 BP | Building Permit | Install Flex Duct/Ceiling Register In Basement | Final | $200 |
| Feb 12, 1998 | 1998-000659 EP | Electrical Permit | Install Flex Duct/Ceiling Register In Basement | Final | $200 |
| Feb 12, 1998 | 1998-000659 MP | Mechanical Permit | Install Flex Duct/Ceiling Register In Basement | Final | $200 |
| Oct 15, 1997 | 1997-004549 EP | Electrical Permit | Relamp & Reballast & Install New Fixtures | Final | $53,480 |
| Oct 15, 1997 | 1997-004549 MP | Mechanical Permit | Relamp & Reballast & Install New Fixtures | Final | $53,480 |
| Apr 8, 1997 | 1997-005909 DS | Driveway / Sidewalks | Ivr Test Permit | VOID | $500 |
| Apr 8, 1997 | 1997-005911 DS | Driveway / Sidewalks | Ivr Test Permit | VOID | $500 |
| Apr 8, 1997 | 1997-005909 BP | Building Permit | Ivr Test Permit | VOID | $500 |
| Apr 8, 1997 | 1997-005909 EP | Electrical Permit | Ivr Test Permit | VOID | $500 |
| Apr 8, 1997 | 1997-005909 MP | Mechanical Permit | Ivr Test Permit | VOID | $500 |
| Apr 8, 1997 | 1997-005909 PP | Plumbing Permit | Ivr Test Permit | VOID | $500 |
| Apr 8, 1997 | 1997-005911 BP | Building Permit | Ivr Test Permit | VOID | $500 |
| Apr 8, 1997 | 1997-005911 EP | Electrical Permit | Ivr Test Permit | VOID | $500 |
| Apr 8, 1997 | 1997-005911 PP | Plumbing Permit | Ivr Test Permit | VOID | $500 |
| Apr 8, 1997 | 1997-005911 MP | Mechanical Permit | Ivr Test Permit | Final | $500 |
| Mar 28, 1996 | 1996-003257 BP | Building Permit | Hvac Remodel System Commercial Offices | Final | $181,000 |
| Mar 28, 1996 | 1996-003257 EP | Electrical Permit | Hvac Remodel System Commercial Offices | Final | $181,000 |
| Mar 28, 1996 | 1996-003257 MP | Mechanical Permit | Hvac Remodel System Commercial Offices | Final | $181,000 |
| Dec 7, 1995 | 1995-016329 EP | Electrical Permit | 4 U/G H&T Loops | Final | $300 |
| Dec 7, 1995 | 1995-016329 MP | Mechanical Permit | 4 U/G H&T Loops | Final | $300 |
| Dec 7, 1995 | 1995-016330 EP | Electrical Permit | 4 U/G H&T Loops | Final | $300 |
| Dec 7, 1995 | 1995-016330 MP | Mechanical Permit | 4 U/G H&T Loops | Final | $300 |
| Nov 29, 1995 | 1995-013732 EP | Electrical Permit | 4 H & T Loops U/G | Final | $300 |
| Nov 29, 1995 | 1995-013732 MP | Mechanical Permit | 4 H & T Loops U/G | Final | $300 |
| Nov 28, 1995 | 1995-013634 EP | Electrical Permit | 4 H & T Loops U/G | Final | $300 |
| Nov 28, 1995 | 1995-013634 MP | Mechanical Permit | 4 H & T Loops U/G | Final | $300 |
| Nov 14, 1995 | 1995-013160 EP | Electrical Permit | 4 H & T Loops U/G | Final | $300 |
| Nov 14, 1995 | 1995-013160 MP | Mechanical Permit | 4 H & T Loops U/G | Final | $300 |
| Nov 14, 1995 | 1995-013162 EP | Electrical Permit | 5 H & T Loops U/G | Final | $375 |
| Nov 14, 1995 | 1995-013162 MP | Mechanical Permit | 5 H & T Loops U/G | Final | $375 |
| Nov 14, 1995 | 1995-013171 EP | Electrical Permit | 3 Temporary Electric Meter Loops | Final | $500 |
| Nov 14, 1995 | 1995-013171 MP | Mechanical Permit | 3 Temporary Electric Meter Loops | Final | $500 |
| Nov 7, 1995 | 1995-010899 EP | Electrical Permit | 4 H & T Loops Ug | Final | $300 |
| Nov 7, 1995 | 1995-010899 MP | Mechanical Permit | 4 H & T Loops Ug | Final | $300 |
| Oct 27, 1995 | 1995-010559 EP | Electrical Permit | H-T Loop O/H | Final | $100 |
| Oct 27, 1995 | 1995-010559 MP | Mechanical Permit | H-T Loop O/H | Final | $100 |
| Oct 24, 1995 | 1995-010362 EP | Electrical Permit | 4 H & T Loops Ug | Final | $300 |
| Oct 24, 1995 | 1995-010362 MP | Mechanical Permit | 4 H & T Loops Ug | Final | $300 |
| Oct 12, 1995 | 1995-007939 BP | Building Permit | 4 Ug H & T Loops | Final | $400 |
| Oct 12, 1995 | 1995-007939 EP | Electrical Permit | 4 Ug H & T Loops | Final | $400 |
| Oct 12, 1995 | 1995-007939 MP | Mechanical Permit | 4 Ug H & T Loops | Final | $400 |
| Oct 4, 1995 | 1995-007548 EP | Electrical Permit | 4 H & T Loops Ug | Final | $300 |
| Oct 4, 1995 | 1995-007548 MP | Mechanical Permit | 4 H & T Loops Ug | Final | $300 |
| Sep 26, 1995 | 1995-005445 EP | Electrical Permit | 4 Ug H&T Loops | Final | $500 |
| Sep 26, 1995 | 1995-005445 MP | Mechanical Permit | 4 Ug H&T Loops | Final | $500 |
| Sep 26, 1995 | 1995-005446 EP | Electrical Permit | 3 Ug H&T Loops | Final | $300 |
| Sep 26, 1995 | 1995-005446 MP | Mechanical Permit | 3 Ug H&T Loops | Final | $300 |
| Sep 25, 1995 | 1995-005291 EP | Electrical Permit | 3 Ug H & T Loops | Final | $300 |
| Sep 25, 1995 | 1995-005291 MP | Mechanical Permit | 3 Ug H & T Loops | Final | $300 |
| Sep 6, 1995 | 1995-002199 EP | Electrical Permit | H & T Loop Ug | Final | $100 |
| Sep 6, 1995 | 1995-002199 MP | Mechanical Permit | H & T Loop Ug | Final | $100 |
| Aug 30, 1995 | 1995-001891 EP | Electrical Permit | 4 H & T Loops | Final | $600 |
| Aug 30, 1995 | 1995-001891 MP | Mechanical Permit | 4 H & T Loops | Final | $600 |
| Aug 30, 1995 | 1995-001894 EP | Electrical Permit | 4 H & T Loops | Final | $600 |
| Aug 30, 1995 | 1995-001894 MP | Mechanical Permit | 4 H & T Loops | Final | $600 |
| Aug 28, 1995 | 1995-015972 EP | Electrical Permit | 4 H & T Loops | Final | $600 |
| Aug 28, 1995 | 1995-015972 MP | Mechanical Permit | 4 H & T Loops | Final | $600 |
| Aug 16, 1995 | 1995-015455 EP | Electrical Permit | Temporary Loop | Final | $100 |
| Aug 16, 1995 | 1995-015455 MP | Mechanical Permit | Temporary Loop | Final | $100 |
| Aug 15, 1995 | 1995-015312 EP | Electrical Permit | 2 U/G Loops | Final | $150 |
| Aug 15, 1995 | 1995-015312 MP | Mechanical Permit | 2 U/G Loops | Final | $150 |
| Aug 7, 1995 | 1995-012747 EP | Electrical Permit | 5 H & T Loops | Final | $500 |
| Aug 7, 1995 | 1995-012747 MP | Mechanical Permit | 5 H & T Loops | Final | $500 |
| Aug 7, 1995 | 1995-012750 EP | Electrical Permit | 5 H & T Loops | Final | $500 |
| Aug 7, 1995 | 1995-012750 MP | Mechanical Permit | 5 H & T Loops | Final | $500 |
| Jul 12, 1995 | 1995-009716 EP | Electrical Permit | Temporary U/G Meter Loop | Final | $190 |
| Jul 12, 1995 | 1995-009716 MP | Mechanical Permit | Temporary U/G Meter Loop | Final | $190 |
| Jul 11, 1995 | 1995-009603 EP | Electrical Permit | Temporary Electric Meter Loop | Final | $100 |
| Jul 11, 1995 | 1995-009603 MP | Mechanical Permit | Temporary Electric Meter Loop | Final | $100 |
| Jul 6, 1995 | 1995-009440 EP | Electrical Permit | H/T Loop | Final | $300 |
| Jul 6, 1995 | 1995-009440 MP | Mechanical Permit | H/T Loop | Final | $300 |
| Jun 23, 1995 | 1995-007012 EP | Electrical Permit | H & T Loop O/H | Final | $100 |
| Jun 23, 1995 | 1995-007012 MP | Mechanical Permit | H & T Loop O/H | Final | $100 |
| Jun 13, 1995 | 1995-004600 EP | Electrical Permit | H/T Loop | Final | $200 |
| Jun 13, 1995 | 1995-004600 MP | Mechanical Permit | H/T Loop | Final | $200 |
| Jun 8, 1995 | 1995-004434 EP | Electrical Permit | Change Out A/C In Council Chambers - 20 Ton | Final | $16,987 |
| Jun 8, 1995 | 1995-004434 MP | Mechanical Permit | Change Out A/C In Council Chambers - 20 Ton | Final | $16,987 |
| Jun 8, 1995 | 1995-004435 EP | Electrical Permit | 4 H & T Loops | Final | $400 |
| Jun 8, 1995 | 1995-004435 MP | Mechanical Permit | 4 H & T Loops | Final | $400 |
| May 31, 1995 | 1995-001780 EP | Electrical Permit | H-T Loop O/H | Final | $100 |
| May 31, 1995 | 1995-001780 MP | Mechanical Permit | H-T Loop O/H | Final | $100 |
| May 30, 1995 | 1995-001655 EP | Electrical Permit | 1 H/T Loop | Final | $200 |
| May 30, 1995 | 1995-001655 MP | Mechanical Permit | 1 H/T Loop | Final | $200 |
| May 24, 1995 | 1995-001485 EP | Electrical Permit | H-T Loop | Final | $50 |
| May 24, 1995 | 1995-001485 MP | Mechanical Permit | H-T Loop | Final | $50 |
| Apr 18, 1995 | 1995-011599 EP | Electrical Permit | H-T Loop Ug | Final | $50 |
| Apr 18, 1995 | 1995-011599 MP | Mechanical Permit | H-T Loop Ug | Final | $50 |
| Apr 14, 1995 | 1995-011484 EP | Electrical Permit | H-T Loop O/H | Final | $100 |
| Apr 14, 1995 | 1995-011484 MP | Mechanical Permit | H-T Loop O/H | Final | $100 |
| Feb 14, 1995 | 1995-003558 EP | Electrical Permit | H-T Loop U/G | Final | $100 |
| Feb 14, 1995 | 1995-003558 MP | Mechanical Permit | H-T Loop U/G | Final | $100 |
| Jan 10, 1995 | 1995-014119 EP | Electrical Permit | H-T Loop O/H | Final | $100 |
| Jan 10, 1995 | 1995-014119 MP | Mechanical Permit | H-T Loop O/H | Final | $100 |
| Nov 14, 1994 | 1994-010750 EP | Electrical Permit | 6 H & T Loops | Final | $750 |
| Nov 14, 1994 | 1994-010750 MP | Mechanical Permit | 6 H & T Loops | Final | $750 |
| Oct 13, 1994 | 1994-007681 EP | Electrical Permit | H & T Loop | Final | $500 |
| Oct 13, 1994 | 1994-007681 MP | Mechanical Permit | H & T Loop | Final | $500 |
| Oct 7, 1994 | 1994-007440 EP | Electrical Permit | 2-H & T Loops | Final | $500 |
| Oct 7, 1994 | 1994-007440 MP | Mechanical Permit | 2-H & T Loops | Final | $500 |
| Oct 5, 1994 | 1994-007338 EP | Electrical Permit | 2 H&T Loops | Final | $300 |
| Oct 5, 1994 | 1994-007338 MP | Mechanical Permit | 2 H&T Loops | Final | $300 |
| Oct 4, 1994 | 1994-005487 EP | Electrical Permit | 2-H & T Loops | Final | $500 |
| Oct 4, 1994 | 1994-005487 MP | Mechanical Permit | 2-H & T Loops | Final | $500 |
| Sep 23, 1994 | 1994-005005 EP | Electrical Permit | 1 H & T Loop | Final | $100 |
| Sep 23, 1994 | 1994-005005 MP | Mechanical Permit | 1 H & T Loop | Final | $100 |
| Sep 21, 1994 | 1994-004876 EP | Electrical Permit | H-T Loop | Final | $100 |
| Sep 21, 1994 | 1994-004876 MP | Mechanical Permit | H-T Loop | Final | $100 |
| Sep 15, 1994 | 1994-004599 EP | Electrical Permit | 6 H & T Loop | Final | $400 |
| Sep 15, 1994 | 1994-004599 MP | Mechanical Permit | 6 H & T Loop | Final | $400 |
| Aug 25, 1994 | 1994-001783 EP | Electrical Permit | H-T Loop | Final | $100 |
| Aug 25, 1994 | 1994-001783 MP | Mechanical Permit | H-T Loop | Final | $100 |
| Aug 23, 1994 | 1994-015976 EP | Electrical Permit | H-T Loop | Final | $50 |
| Aug 23, 1994 | 1994-015976 MP | Mechanical Permit | H-T Loop | Final | $50 |
| Aug 12, 1994 | 1994-015488 EP | Electrical Permit | H & T Loop O/H | Final | $250 |
| Aug 12, 1994 | 1994-015488 MP | Mechanical Permit | H & T Loop O/H | Final | $250 |
| Aug 8, 1994 | 1994-015187 EP | Electrical Permit | H/T Loop | Final | $100 |
| Aug 8, 1994 | 1994-015187 MP | Mechanical Permit | H/T Loop | Final | $100 |
| Jul 22, 1994 | 1994-012302 EP | Electrical Permit | H & T Loop | Final | $100 |
| Jul 22, 1994 | 1994-012302 MP | Mechanical Permit | H & T Loop | Final | $100 |
| Jul 5, 1994 | 1994-009508 MP | Mechanical Permit | H/T Underground Loop | VOID | $200 |
| Jul 5, 1994 | 1994-009490 EP | Electrical Permit | H-T Loop | Final | $100 |
| Jul 5, 1994 | 1994-009490 MP | Mechanical Permit | H-T Loop | Final | $100 |
| Jun 22, 1994 | 1994-007036 EP | Electrical Permit | 2 H & T Loops O/H | Final | $200 |
| Jun 22, 1994 | 1994-007036 MP | Mechanical Permit | 2 H & T Loops O/H | Final | $200 |
| Jun 16, 1994 | 1994-006690 EP | Electrical Permit | 4 H & T Loops Oh | Final | $400 |
| Jun 16, 1994 | 1994-006690 MP | Mechanical Permit | 4 H & T Loops Oh | Final | $400 |
| Jun 16, 1994 | 1994-006691 EP | Electrical Permit | 4 H & T Loops Oh | Final | $400 |
| Jun 16, 1994 | 1994-006691 MP | Mechanical Permit | 4 H & T Loops Oh | Final | $400 |
| Jun 3, 1994 | 1994-004276 MP | Mechanical Permit | 1 Ht/ Loop | Final | $100 |
| Jun 3, 1994 | 1994-004276 EP | ELECTRICAL PERMIT | 1 Ht/ Loop | FINAL | $100 |
| Jun 1, 1994 | 1994-004134 EP | Electrical Permit | 3 H/T Loops O/H | Final | $300 |
| Jun 1, 1994 | 1994-004134 MP | Mechanical Permit | 3 H/T Loops O/H | Final | $300 |
| May 23, 1994 | 1994-003709 EP | Electrical Permit | 2 H & T Loops | Final | $200 |
| May 23, 1994 | 1994-003709 MP | Mechanical Permit | 2 H & T Loops | Final | $200 |
| May 20, 1994 | 1994-003654 EP | Electrical Permit | H & T Loop For Temporary Job Trailer | Final | $150 |
| May 20, 1994 | 1994-003654 MP | Mechanical Permit | H & T Loop For Temporary Job Trailer | Final | $150 |
| May 18, 1994 | 1994-001693 EP | Electrical Permit | Temporary Meter Loop | Final | $100 |
| May 18, 1994 | 1994-001693 MP | Mechanical Permit | Temporary Meter Loop | Final | $100 |
| May 12, 1994 | 1994-001423 EP | Electrical Permit | 6 H & T Loops | VOID | $600 |
| May 12, 1994 | 1994-001423 MP | Mechanical Permit | 6 H & T Loops | VOID | $600 |
| May 10, 1994 | 1994-001300 EP | Electrical Permit | H-T Loop O/H | Final | $100 |
| May 10, 1994 | 1994-001300 MP | Mechanical Permit | H-T Loop O/H | Final | $100 |
| May 6, 1994 | 1994-001128 EP | Electrical Permit | H & T Loop O/H | Final | $100 |
| May 6, 1994 | 1994-001150 EP | Electrical Permit | 3 H & T Loop O/H | Final | $300 |
| May 6, 1994 | 1994-001150 MP | Mechanical Permit | 3 H & T Loop O/H | Final | $300 |
| May 6, 1994 | 1994-001128 MP | MECHANICAL PERMIT | H & T Loop O/H | FINAL | $100 |
| Apr 29, 1994 | 1994-015110 EP | Electrical Permit | 2-Overhead Meter | Final | $500 |
| Apr 29, 1994 | 1994-015110 MP | Mechanical Permit | 2-Overhead Meter | Final | $500 |
| Apr 27, 1994 | 1994-014963 EP | Electrical Permit | H-T Loop O/H | Final | $100 |
| Apr 27, 1994 | 1994-014963 MP | Mechanical Permit | H-T Loop O/H | Final | $100 |
| Apr 21, 1994 | 1994-014660 EP | Electrical Permit | 4 H & T Loops | Final | $400 |
| Apr 21, 1994 | 1994-014660 MP | Mechanical Permit | 4 H & T Loops | Final | $400 |
| Apr 21, 1994 | 1994-014661 EP | Electrical Permit | 4 H & T Loops | Final | $400 |
| Apr 21, 1994 | 1994-014661 MP | Mechanical Permit | 4 H & T Loops | Final | $400 |
| Apr 18, 1994 | 1994-014457 EP | Electrical Permit | 6 H&T Loops | Final | $600 |
| Apr 18, 1994 | 1994-014457 MP | Mechanical Permit | 6 H&T Loops | Final | $600 |
| Apr 18, 1994 | 1994-014458 EP | Electrical Permit | 2 H&T Loops | Final | $200 |
| Apr 18, 1994 | 1994-014458 MP | Mechanical Permit | 2 H&T Loops | Final | $200 |
| Mar 30, 1994 | 1994-011330 EP | Electrical Permit | 5 H-T Loops | Final | $500 |
| Mar 30, 1994 | 1994-011330 MP | Mechanical Permit | 5 H-T Loops | Final | $500 |
| Mar 24, 1994 | 1994-009102 EP | Electrical Permit | 6 H & T Loops U/G | Final | $600 |
| Mar 24, 1994 | 1994-009102 MP | Mechanical Permit | 6 H & T Loops U/G | Final | $600 |
| Mar 14, 1994 | 1994-008579 EP | Electrical Permit | 3 H-T Loops U/G | Final | $300 |
| Mar 14, 1994 | 1994-008579 MP | Mechanical Permit | 3 H-T Loops U/G | Final | $300 |
| Mar 14, 1994 | 1994-008594 EP | Electrical Permit | 4-H & T Loop U/G | Final | $100 |
| Mar 14, 1994 | 1994-008594 MP | Mechanical Permit | 4-H & T Loop U/G | Final | $100 |
| Mar 8, 1994 | 1994-006380 EP | Electrical Permit | 5 H/T Loops | Final | $500 |
| Mar 8, 1994 | 1994-006380 MP | Mechanical Permit | 5 H/T Loops | Final | $500 |
| Feb 23, 1994 | 1994-005684 EP | Electrical Permit | 6 H-T Loops O/H | Final | $600 |
| Feb 23, 1994 | 1994-005684 MP | Mechanical Permit | 6 H-T Loops O/H | Final | $600 |
| Feb 18, 1994 | 1994-005539 EP | Electrical Permit | H-T Loop For 927 Rch Rd 620 S | Final | $50 |
| Feb 18, 1994 | 1994-005539 MP | Mechanical Permit | H-T Loop For 927 Rch Rd 620 S | Final | $50 |
| Feb 7, 1994 | 1994-003089 EP | Electrical Permit | H And T Loop O/H | Final | $200 |
| Feb 7, 1994 | 1994-003089 MP | Mechanical Permit | H And T Loop O/H | Final | $200 |
| Feb 7, 1994 | 1994-003111 EP | Electrical Permit | 1 H/T Loop-Underground | Final | $300 |
| Feb 7, 1994 | 1994-003111 MP | Mechanical Permit | 1 H/T Loop-Underground | Final | $300 |
| Feb 2, 1994 | 1994-002858 EP | Electrical Permit | H And T Loop O/H | Final | $100 |
| Feb 2, 1994 | 1994-002858 MP | Mechanical Permit | H And T Loop O/H | Final | $100 |
| Feb 2, 1994 | 1994-002867 EP | Electrical Permit | 6 H/T Loop - Underground | Final | $900 |
| Feb 2, 1994 | 1994-002867 MP | Mechanical Permit | 6 H/T Loop - Underground | Final | $900 |
| Feb 1, 1994 | 1994-002842 EP | Electrical Permit | H/T Loop-Underground | Final | $100 |
| Feb 1, 1994 | 1994-002842 MP | Mechanical Permit | H/T Loop-Underground | Final | $100 |
| Jan 27, 1994 | 1994-000785 EP | Electrical Permit | H/T Loop-Underground | Final | $100 |
| Jan 27, 1994 | 1994-000785 MP | Mechanical Permit | H/T Loop-Underground | Final | $100 |
| Jan 26, 1994 | 1994-000738 EP | Electrical Permit | H & T Loop Underground | Final | $200 |
| Jan 26, 1994 | 1994-000738 MP | Mechanical Permit | H & T Loop Underground | Final | $200 |
| Jan 12, 1994 | 1994-000196 EP | Electrical Permit | H-T Loop O/H | Final | $100 |
| Jan 12, 1994 | 1994-000196 MP | Mechanical Permit | H-T Loop O/H | Final | $100 |
| Jan 10, 1994 | 1994-000025 EP | Electrical Permit | H-T Loop O/H | Final | $100 |
| Jan 10, 1994 | 1994-000025 MP | Mechanical Permit | H-T Loop O/H | Final | $100 |
| Jan 7, 1994 | 1994-014266 EP | Electrical Permit | H And T Loop O/H | Final | $200 |
| Jan 7, 1994 | 1994-014266 MP | Mechanical Permit | H And T Loop O/H | Final | $200 |
| Dec 29, 1993 | 1993-016051 EP | Electrical Permit | H-T Loop U/G | Final | $100 |
| Dec 29, 1993 | 1993-016051 MP | Mechanical Permit | H-T Loop U/G | Final | $100 |
| Dec 15, 1993 | 1993-013329 EP | Electrical Permit | H And T Loop | Final | $200 |
| Dec 15, 1993 | 1993-013329 MP | Mechanical Permit | H And T Loop | Final | $200 |
| Dec 13, 1993 | 1993-013214 EP | Electrical Permit | H/T Loop | Final | $100 |
| Dec 13, 1993 | 1993-013214 MP | Mechanical Permit | H/T Loop | Final | $100 |
| Dec 9, 1993 | 1993-013095 EP | Electrical Permit | 4 Construction Loops | Final | $400 |
| Dec 9, 1993 | 1993-013095 MP | Mechanical Permit | 4 Construction Loops | Final | $400 |
| Dec 1, 1993 | 1993-012701 EP | Electrical Permit | 4 H-T Loops | Final | $400 |
| Dec 1, 1993 | 1993-012701 MP | Mechanical Permit | 4 H-T Loops | Final | $400 |
| Nov 8, 1993 | 1993-008167 EP | Electrical Permit | H-T Loop U/G | Final | $100 |
| Nov 8, 1993 | 1993-008167 MP | Mechanical Permit | H-T Loop U/G | Final | $100 |
| Nov 8, 1993 | 1993-008167 PP | Plumbing Permit | H-T Loop U/G | Final | $100 |
| Nov 5, 1993 | 1993-008116 EP | Electrical Permit | H & T Loop O/H | Final | $300 |
| Nov 5, 1993 | 1993-008116 MP | Mechanical Permit | H & T Loop O/H | Final | $300 |
| Oct 20, 1993 | 1993-007414 EP | Electrical Permit | H And T Loop | Final | $200 |
| Oct 20, 1993 | 1993-007414 MP | Mechanical Permit | H And T Loop | Final | $200 |
| Oct 15, 1993 | 1993-005333 EP | Electrical Permit | H/T Loop | Final | $100 |
| Oct 15, 1993 | 1993-005333 MP | Mechanical Permit | H/T Loop | Final | $100 |
| Oct 13, 1993 | 1993-005237 EP | Electrical Permit | H-T Loops (4 O/H & 3 U/G) | Final | $700 |
| Oct 13, 1993 | 1993-005237 MP | Mechanical Permit | H-T Loops (4 O/H & 3 U/G) | Final | $700 |
| Oct 6, 1993 | 1993-004842 EP | Electrical Permit | 3 H & T Loop U/G | Final | $100 |
| Oct 6, 1993 | 1993-004842 MP | Mechanical Permit | 3 H & T Loop U/G | Final | $100 |
| Oct 6, 1993 | 1993-004877 EP | Electrical Permit | 2 H And T Loops | Final | $200 |
| Oct 6, 1993 | 1993-004877 MP | Mechanical Permit | 2 H And T Loops | Final | $200 |
| Sep 17, 1993 | 1993-002131 EP | Electrical Permit | H And T Loop | Final | $200 |
| Sep 17, 1993 | 1993-002131 MP | Mechanical Permit | H And T Loop | Final | $200 |
| Sep 15, 1993 | 1993-002016 EP | Electrical Permit | 4 U/G Temp Loops | Final | $600 |
| Sep 15, 1993 | 1993-002016 MP | Mechanical Permit | 4 U/G Temp Loops | Final | $600 |
| Sep 13, 1993 | 1993-001879 EP | Electrical Permit | 1 Construction Loop (U/G) | Final | $100 |
| Sep 13, 1993 | 1993-001879 MP | Mechanical Permit | 1 Construction Loop (U/G) | Final | $100 |
| Sep 3, 1993 | 1993-015419 EP | Electrical Permit | 6 H And T Loops U/G | Final | $200 |
| Sep 3, 1993 | 1993-015419 MP | Mechanical Permit | 6 H And T Loops U/G | Final | $200 |
| Sep 2, 1993 | 1993-015383 PP | Plumbing Permit | Changeout 3 Drinking Fountains For Ada | Final | $1,900 |
| Sep 2, 1993 | 1993-015405 EP | Electrical Permit | 1-Underground & 2-Overhead H & T Loop | Final | $500 |
| Sep 2, 1993 | 1993-015405 MP | Mechanical Permit | 1-Underground & 2-Overhead H & T Loop | Final | $500 |
| Aug 30, 1993 | 1993-015173 EP | Electrical Permit | 5 H/T Loops U/G | Final | $500 |
| Aug 30, 1993 | 1993-015173 MP | Mechanical Permit | 5 H/T Loops U/G | Final | $500 |
| Aug 25, 1993 | 1993-014951 EP | Electrical Permit | 4 Ug H/T Loops | Final | $200 |
| Aug 25, 1993 | 1993-014951 MP | Mechanical Permit | 4 Ug H/T Loops | Final | $200 |
| Aug 23, 1993 | 1993-014875 EP | Electrical Permit | Temporary Electric Meter Loop | Final | $200 |
| Aug 23, 1993 | 1993-014875 MP | Mechanical Permit | Temporary Electric Meter Loop | Final | $200 |
| Aug 16, 1993 | 1993-012198 EP | Electrical Permit | H & T Loop | Final | $500 |
| Aug 16, 1993 | 1993-012198 MP | Mechanical Permit | H & T Loop | Final | $500 |
| Aug 16, 1993 | 1993-012241 EP | Electrical Permit | 5-Underground H & T Loop | Final | $500 |
| Aug 16, 1993 | 1993-012241 MP | Mechanical Permit | 5-Underground H & T Loop | Final | $500 |
| Aug 12, 1993 | 1993-012095 EP | Electrical Permit | 4 H & T Loop U/H | Final | $200 |
| Aug 12, 1993 | 1993-012095 MP | Mechanical Permit | 4 H & T Loop U/H | Final | $200 |
| Jul 30, 1993 | 1993-009861 EP | Electrical Permit | H/T Loop | Final | $100 |
| Jul 30, 1993 | 1993-009861 MP | Mechanical Permit | H/T Loop | Final | $100 |
| Jul 29, 1993 | 1993-009804 EP | Electrical Permit | Replace A/C Unit In Basement For Music Channel | VOID | $4,000 |
| Jul 29, 1993 | 1993-009804 MP | Mechanical Permit | Replace A/C Unit In Basement For Music Channel | VOID | $4,000 |
| Jul 26, 1993 | 1993-009624 BP | Building Permit | Interior Misc. Modifications To Comply W/Ada | Final | $30,000 |
| Jul 26, 1993 | 1993-009624 EP | Electrical Permit | Interior Misc. Modifications To Comply W/Ada | Final | $30,000 |
| Jul 26, 1993 | 1993-009624 MP | Mechanical Permit | Interior Misc. Modifications To Comply W/Ada | Final | $30,000 |
| Jul 19, 1993 | 1993-009184 EP | Electrical Permit | H-T Loop | Final | $100 |
| Jul 19, 1993 | 1993-009184 MP | Mechanical Permit | H-T Loop | Final | $100 |
| Jul 15, 1993 | 1993-007273 EP | Electrical Permit | 5 H-T Loops Underground | Final | $500 |
| Jul 15, 1993 | 1993-007273 MP | Mechanical Permit | 5 H-T Loops Underground | Final | $500 |
| Jul 13, 1993 | 1993-007123 EP | Electrical Permit | 2 H-T Loops | Final | $100 |
| Jul 13, 1993 | 1993-007123 MP | Mechanical Permit | 2 H-T Loops | Final | $100 |
| Jul 6, 1993 | 1993-006769 PP | Plumbing Permit | Install Water Heater (Comm) | Final | $350 |
| Jun 28, 1993 | 1993-006432 EP | Electrical Permit | H & T Loop O/H | Final | $100 |
| Jun 28, 1993 | 1993-006432 MP | Mechanical Permit | H & T Loop O/H | Final | $100 |
| Jun 16, 1993 | 1993-004207 EP | Electrical Permit | H And T Loop | Final | $200 |
| Jun 16, 1993 | 1993-004207 MP | Mechanical Permit | H And T Loop | Final | $200 |
| Jun 14, 1993 | 1993-004026 EP | Electrical Permit | H-T Loop | Final | $100 |
| Jun 14, 1993 | 1993-004026 MP | Mechanical Permit | H-T Loop | Final | $100 |
| Jun 14, 1993 | 1993-004045 EP | Electrical Permit | 5 Temporary Electric Meter Loops | Final | $500 |
| Jun 14, 1993 | 1993-004045 MP | Mechanical Permit | 5 Temporary Electric Meter Loops | Final | $500 |
| Jun 9, 1993 | 1993-003860 EP | Electrical Permit | 2 H & T Loop U/G | Final | $100 |
| Jun 9, 1993 | 1993-003860 MP | Mechanical Permit | 2 H & T Loop U/G | Final | $100 |
| Jun 4, 1993 | 1993-001838 EP | Electrical Permit | 5 H-T Loops | Final | $500 |
| Jun 4, 1993 | 1993-001838 MP | Mechanical Permit | 5 H-T Loops | Final | $500 |
| May 27, 1993 | 1993-001508 EP | Electrical Permit | 2 Temporary H & T Loops | Final | $300 |
| May 27, 1993 | 1993-001508 MP | Mechanical Permit | 2 Temporary H & T Loops | Final | $300 |
| May 12, 1993 | 1993-014735 EP | Electrical Permit | H-T Loop | Final | $100 |
| May 12, 1993 | 1993-014735 MP | Mechanical Permit | H-T Loop | Final | $100 |
| May 3, 1993 | 1993-014302 EP | Electrical Permit | 8 H And T Loop | Final | $200 |
| May 3, 1993 | 1993-014302 MP | Mechanical Permit | 8 H And T Loop | Final | $200 |
| Apr 14, 1993 | 1993-011108 EP | Electrical Permit | H & T Loop U/G | Final | $150 |
| Apr 14, 1993 | 1993-011108 MP | Mechanical Permit | H & T Loop U/G | Final | $150 |
| Mar 26, 1993 | 1993-008675 EP | Electrical Permit | 2 H And T Loop U/G | Final | $200 |
| Mar 26, 1993 | 1993-008675 MP | Mechanical Permit | 2 H And T Loop U/G | Final | $200 |
| Mar 16, 1993 | 1993-006323 BP | Building Permit | Remodel Offices In Channel 6 For Music Channel | Final | $2,000 |
| Mar 16, 1993 | 1993-006323 MP | Mechanical Permit | Remodel Offices In Channel 6 For Music Channel | VOID | $2,000 |
| Mar 16, 1993 | 1993-006323 EP | Electrical Permit | Remodel Offices In Channel 6 For Music Channel | Final | $2,000 |
| Mar 10, 1993 | 1993-006068 EP | Electrical Permit | 3 H & T Loop | Final | $500 |
| Mar 10, 1993 | 1993-006068 MP | Mechanical Permit | 3 H & T Loop | Final | $500 |
| Mar 10, 1993 | 1993-006070 EP | Electrical Permit | 3- H & T Loop | Final | $500 |
| Mar 10, 1993 | 1993-006070 MP | Mechanical Permit | 3- H & T Loop | Final | $500 |
| Mar 9, 1993 | 1993-005933 EP | Electrical Permit | 3 H-T Loops | Final | $300 |
| Mar 9, 1993 | 1993-005933 MP | Mechanical Permit | 3 H-T Loops | Final | $300 |
| Feb 17, 1993 | 1993-003168 EP | Electrical Permit | 2 H And T Loop U/G | Final | $200 |
| Feb 17, 1993 | 1993-003168 MP | MECHANICAL PERMIT | 2 H And T Loop U/G | FINAL | $200 |
| Feb 4, 1993 | 1993-000862 BP | BUILDING PERMIT | Remodel Restrooms For Ada 1st Floor | FINAL | $500 |
| Jan 21, 1993 | 1993-000320 BP | Building Permit | Build Door Between Chambers & Channel 6/Build | Final | $500 |
| Jan 20, 1993 | 1993-000293 EP | ELECTRICAL PERMIT | H & T Loop U/G | FINAL | $500 |
| Jan 20, 1993 | 1993-000293 MP | MECHANICAL PERMIT | H & T Loop U/G | FINAL | $500 |
| Dec 2, 1992 | 1992-012605 EP | Electrical Permit | H & T Loop | Final | $100 |
| Dec 2, 1992 | 1992-012605 MP | Mechanical Permit | H & T Loop | Final | $100 |
| Nov 24, 1992 | 1992-010531 EP | Electrical Permit | 2 Underground & 1 Overhead Temporary El Loops | Final | $300 |
| Nov 24, 1992 | 1992-010531 MP | Mechanical Permit | 2 Underground & 1 Overhead Temporary El Loops | Final | $300 |
| Nov 18, 1992 | 1992-010297 PP | PLUMBING PERMIT | Remodel Plumbing In 1st Floor Restrooms-Comm | FINAL | $500 |
| Nov 17, 1992 | 1992-010228 EP | Electrical Permit | H & T Loop U/G | Final | $100 |
| Nov 17, 1992 | 1992-010228 MP | Mechanical Permit | H & T Loop U/G | Final | $100 |
| Nov 9, 1992 | 1992-009935 EP | Electrical Permit | H & T Loop U/G | Final | $100 |
| Nov 9, 1992 | 1992-009935 MP | Mechanical Permit | H & T Loop U/G | Final | $100 |
| Nov 4, 1992 | 1992-009757 BP | Building Permit | Demo One WallClose Two Doors & Relocate One | Final | $2,200 |
| Nov 4, 1992 | 1992-009757 EP | Electrical Permit | Demo One WallClose Two Doors & Relocate One | Final | $2,200 |
| Nov 4, 1992 | 1992-009757 MP | Mechanical Permit | Demo One WallClose Two Doors & Relocate One | Final | $2,200 |
| Oct 20, 1992 | 1992-007161 MP | Mechanical Permit | H And T Loop | Final | $200 |
| Oct 20, 1992 | 1992-007171 EP | Electrical Permit | Remodel Partitions & Door - Third Floor | Final | $7,626 |
| Oct 20, 1992 | 1992-007171 MP | Mechanical Permit | Remodel Partitions & Door - Third Floor | Final | $7,626 |
| Oct 20, 1992 | 1992-007161 EP | ELECTRICAL PERMIT | H And T Loop | FINAL | $200 |
| Oct 20, 1992 | 1992-007171 BP | BUILDING PERMIT | Remodel Partitions & Door - Third Floor | FINAL | $7,626 |
| Oct 15, 1992 | 1992-006975 EP | Electrical Permit | 5 Construction Loops | Final | $600 |
| Oct 15, 1992 | 1992-006975 MP | Mechanical Permit | 5 Construction Loops | Final | $600 |
| Sep 22, 1992 | 1992-004074 EP | Electrical Permit | 4 H & T Loops Underground & 1 Overhead | Final | $500 |
| Sep 22, 1992 | 1992-004074 MP | Mechanical Permit | 4 H & T Loops Underground & 1 Overhead | Final | $500 |
| Sep 8, 1992 | 1992-001558 EP | Electrical Permit | 5 H And T Loop U/G | Final | $200 |
| Sep 8, 1992 | 1992-001558 MP | Mechanical Permit | 5 H And T Loop U/G | Final | $200 |
| Aug 20, 1992 | 1992-014861 EP | Electrical Permit | H-T Loops U/G | Final | $500 |
| Aug 20, 1992 | 1992-014861 MP | Mechanical Permit | H-T Loops U/G | Final | $500 |
| Aug 4, 1992 | 1992-012302 BP | Building Permit | Remodel For Offices & 1st Floor Archway | Final | $16,000 |
| Aug 4, 1992 | 1992-012302 EP | Electrical Permit | Remodel For Offices & 1st Floor Archway | Final | $16,000 |
| Aug 4, 1992 | 1992-012302 MP | Mechanical Permit | Remodel For Offices & 1st Floor Archway | Final | $16,000 |
| Aug 4, 1992 | 1992-012323 BP | Building Permit | Reroof Existing Building Commercial | Final | $161,305 |
| Aug 4, 1992 | 1992-012323 EP | Electrical Permit | Reroof Existing Building Commercial | Final | $161,305 |
| Aug 4, 1992 | 1992-012323 MP | Mechanical Permit | Reroof Existing Building Commercial | Final | $161,305 |
| Jun 11, 1992 | 1992-005946 EP | Electrical Permit | Five H And T Loops U/G | Final | $500 |
| Jun 11, 1992 | 1992-005946 MP | Mechanical Permit | Five H And T Loops U/G | Final | $500 |
| Apr 28, 1992 | 1992-014230 EP | Electrical Permit | 4 H & T Loop U/G | Final | $500 |
| Apr 28, 1992 | 1992-014230 MP | Mechanical Permit | 4 H & T Loop U/G | Final | $500 |
| Feb 3, 1992 | 1992-005062 BP | Building Permit | Remodel Doorways For Security System | Final | $1,000 |
| Jan 8, 1992 | 1992-002212 PP | Plumbing Permit | Repair Sewer Line Commercial | Final | $500 |
| Jan 6, 1992 | 1992-000230 BP | Building Permit | Repair Water Damaged Wall | Final | $500 |
| Jan 6, 1992 | 1992-000230 PP | Plumbing Permit | Repair Water Damaged Wall | VOID | $500 |
| Jul 29, 1991 | 1991-001343 PP | Plumbing Permit | Replace Ice Machine (Comm) | Final | $100 |
| Jan 7, 1991 | 1991-006604 BP | Building Permit | Re-Roof Existing Building-Council Chambers | Final | $59,100 |
| Jan 7, 1991 | 1991-006604 EP | Electrical Permit | Re-Roof Existing Building-Council Chambers | Final | $59,100 |
| Jan 7, 1991 | 1991-006604 MP | Mechanical Permit | Re-Roof Existing Building-Council Chambers | Final | $59,100 |
| Nov 14, 1990 | 1990-005919 BP | Building Permit | Remodel Cabinets In Cashier Office | Final | $750 |
| Nov 14, 1990 | 1990-005919 EP | Electrical Permit | Remodel Cabinets In Cashier Office | Final | $750 |
| Nov 14, 1990 | 1990-005919 MP | Mechanical Permit | Remodel Cabinets In Cashier Office | Final | $750 |
| Nov 13, 1990 | 1990-005778 BP | Building Permit | Remodel Council Chambers-Handicapped Ramp | Final | $2,000 |
| Nov 1, 1990 | 1990-005382 EP | Electrical Permit | Temporary H & T Loop | Final | $100 |
| Nov 1, 1990 | 1990-005382 MP | Mechanical Permit | Temporary H & T Loop | Final | $100 |
| Sep 20, 1990 | 1990-015438 PP | Plumbing Permit | Replace Bath Room Fixtures | Final | $250 |
| Jul 23, 1990 | 1990-007966 BP | Building Permit | Remodel Council Chambers --- Doors | Final | $450 |
| May 10, 1990 | 1990-014444 EP | Electrical Permit | Remodel Airduct In Dispatch | VOID | $150 |
| Apr 17, 1990 | 1990-011941 PP | Plumbing Permit | Install New Faucet In Basement (Comm) | Final | $50 |
| Mar 8, 1990 | 1990-006498 PP | Plumbing Permit | Plumbing For Water Fountain Commercial | Final | $450 |
| Jan 9, 1990 | 1990-000091 BP | Building Permit | Install Grease Trap For Cafeteria--Basement | Final | $2,350 |
| Jan 9, 1990 | 1990-000091 PP | Plumbing Permit | Install Grease Trap For Cafeteria--Basement | Final | $2,350 |
| Dec 7, 1989 | 1989-015258 EP | Electrical Permit | Electric Only For Fire Alarm System | Final | $60 |
| Dec 7, 1989 | 1989-015258 MP | Mechanical Permit | Electric Only For Fire Alarm System | Final | $60 |
| Sep 22, 1989 | 1989-003998 BP | Building Permit | Remodel Office -- Basement | Final | $500 |
| Sep 12, 1989 | 1989-003547 BP | Building Permit | Remodel For Closet -- 1st Floor | Final | $350 |
| Sep 6, 1989 | 1989-001917 BP | Building Permit | Remodel Existing Office -- Basement | Final | $250 |
| Sep 6, 1989 | 1989-001917 MP | Mechanical Permit | Remodel Existing Office -- Basement | VOID | $250 |
| Sep 6, 1989 | 1989-001917 EP | Electrical Permit | Remodel Existing Office -- Basement | Final | $250 |
| Aug 21, 1989 | 1989-001202 BP | Building Permit | Remodel Office -- 1st Floor | Final | $250 |
| Aug 11, 1989 | 1989-014987 BP | Building Permit | Remodel Office -- 2nd Floor | Final | $4,070 |
| Aug 11, 1989 | 1989-014987 EP | Electrical Permit | Remodel Office -- 2nd Floor | Final | $4,070 |
| Aug 11, 1989 | 1989-014987 MP | Mechanical Permit | Remodel Office -- 2nd Floor | Final | $4,070 |
| Jul 17, 1989 | 1989-011763 EP | Electrical Permit | H And T Loop O/H | Final | $200 |
| Jul 17, 1989 | 1989-011763 MP | Mechanical Permit | H And T Loop O/H | Final | $200 |
| May 1, 1989 | 1989-000994 EP | Electrical Permit | Install 3 Split System Of Air Condition | Final | $5,000 |
| May 1, 1989 | 1989-000994 MP | Mechanical Permit | Install 3 Split System Of Air Condition | Final | $5,000 |
| Feb 16, 1989 | 1989-007703 EP | Electrical Permit | Three (3) Overhead H-T Construction Loops | Final | $300 |
| Feb 16, 1989 | 1989-007703 MP | Mechanical Permit | Three (3) Overhead H-T Construction Loops | Final | $300 |
| Sep 9, 1988 | 1988-007905 BP | Building Permit | Install Wall Doors & Insulation -- 2nd Floor | VOID | $760 |
| Jun 16, 1988 | 1988-011854 BP | Building Permit | Remodel Exist Office -- 2nd Floor | VOID | $9,888 |
| Jun 16, 1988 | 1988-011854 EP | Electrical Permit | Remodel Exist Office -- 2nd Floor | VOID | $9,888 |
| Jun 16, 1988 | 1988-011854 MP | Mechanical Permit | Remodel Exist Office -- 2nd Floor | Final | $9,888 |
| May 12, 1988 | 1988-006734 BP | Building Permit | Remodel Exist Office -- Addn Portion Wall | VOID | $300 |
| Jan 20, 1988 | 1988-006158 BP | Building Permit | Remodel Telec.Tech Offices(Basement-West Side) | Final | $2,400 |
| Jan 20, 1988 | 1988-006158 EP | Electrical Permit | Remodel Telec.Tech Offices(Basement-West Side) | Final | $2,400 |
| Jan 20, 1988 | 1988-006158 MP | Mechanical Permit | Remodel Telec.Tech Offices(Basement-West Side) | Final | $2,400 |
| Oct 15, 1987 | 1987-016536 EP | Electrical Permit | Install A/C In Telephone Room In Existing Bldg | Final | $100 |
| Oct 15, 1987 | 1987-016536 MP | Mechanical Permit | Install A/C In Telephone Room In Existing Bldg | Final | $100 |
| Oct 30, 1986 | 1986-007132 BP | Building Permit | Remodel Interior Of Olds Section 1st Floor | Final | $2,000 |
| Oct 30, 1986 | 1986-007132 MP | Mechanical Permit | Remodel Interior Of Olds Section 1st Floor | VOID | $2,000 |
| Jul 29, 1986 | 1986-002049 BP | Building Permit | Remodel Restrooms On The 3rd Floor | Final | $6,228 |
| Jul 29, 1986 | 1986-002049 MP | Mechanical Permit | Remodel Restrooms On The 3rd Floor | VOID | $6,228 |
| Jul 29, 1986 | 1986-023676 BP | Building Permit | Remodel Interior Of Existing Restrooms | Final | $18,685 |
| Jul 29, 1986 | 1986-023676 MP | Mechanical Permit | Remodel Interior Of Existing Restrooms | VOID | $18,685 |
| Jul 29, 1986 | 1986-002051 BP | Building Permit | Remodel Restrooms On The 2nd Floor | Final | $6,228 |
| Jul 29, 1986 | 1986-002051 EP | Electrical Permit | Remodel Restrooms On The 2nd Floor | Final | $6,228 |
| Jul 29, 1986 | 1986-002051 MP | Mechanical Permit | Remodel Restrooms On The 2nd Floor | Final | $6,228 |
| Jul 29, 1986 | 1986-002051 PP | Plumbing Permit | Remodel Restrooms On The 2nd Floor | Final | $6,228 |
| Mar 3, 1986 | 1986-000325 BP | Building Permit | Remodel Existing Bldg For Restrooms | Final | $17,500 |
| Mar 3, 1986 | 1986-000325 EP | Electrical Permit | Remodel Existing Bldg For Restrooms | Final | $17,500 |
| Mar 3, 1986 | 1986-000325 MP | Mechanical Permit | Remodel Existing Bldg For Restrooms | Final | $17,500 |
| Mar 3, 1986 | 1986-000325 PP | Plumbing Permit | Remodel Existing Bldg For Restrooms | Final | $17,500 |
| Feb 5, 1986 | 1986-017527 BP | BUILDING PERMIT | Remodel Elevator In Exist Building | FINAL | $45,000 |
| Dec 9, 1985 | 1985-004116 BP | Building Permit | Remodel Exist Building--Basement | Final | $41,000 |
| Dec 9, 1985 | 1985-004116 EP | Electrical Permit | Remodel Exist Building--Basement | VOID | $41,000 |
| Dec 9, 1985 | 1985-004116 MP | Mechanical Permit | Remodel Exist Building--Basement | VOID | $41,000 |
| Jun 14, 1985 | 1985-021604 BP | Building Permit | Rem 2 Floor To Create Office Space | VOID | $10,000 |
| Jun 14, 1985 | 1985-021604 EP | Electrical Permit | Rem 2 Floor To Create Office Space | VOID | $10,000 |
| Jun 14, 1985 | 1985-021604 MP | Mechanical Permit | Rem 2 Floor To Create Office Space | VOID | $10,000 |
| Apr 8, 1985 | 1985-016563 BP | Building Permit | Rem Exist Bldg Offices | VOID | $20,000 |
| Apr 8, 1985 | 1985-016563 MP | Mechanical Permit | Rem Exist Bldg Offices | VOID | $20,000 |
| Mar 11, 1985 | 1985-005271 BP | Building Permit | Remodel Int Of Exist Space Remove Int Partitio | Final | $10,000 |
| Mar 11, 1985 | 1985-005271 EP | Electrical Permit | Remodel Int Of Exist Space Remove Int Partitio | Final | $10,000 |
| Oct 3, 1984 | 1984-003703 BP | Building Permit | Remodel Exist Space (Basement) | VOID | $7,500 |
| Oct 3, 1984 | 1984-003703 EP | Electrical Permit | Remodel Exist Space (Basement) | VOID | $7,500 |
| May 17, 1984 | 1984-006205 BP | Building Permit | Remodel Basement Of Exist Commercial Bldg | VOID | $10,000 |
| May 17, 1984 | 1984-006205 EP | Electrical Permit | Remodel Basement Of Exist Commercial Bldg | Final | $10,000 |
| Dec 1, 1983 | 1983-007266 EP | Electrical Permit | Elevator | Final | $6,685 |
| Dec 1, 1983 | 1983-007266 MP | Mechanical Permit | Elevator | Final | $6,685 |
| Oct 31, 1983 | 1983-022877 BP | Building Permit | Remodel Exist Office 1 St Floor | VOID | $5,000 |
| Oct 31, 1983 | 1983-022877 MP | Mechanical Permit | Remodel Exist Office 1 St Floor | VOID | $5,000 |
| Jul 13, 1983 | 1983-014652 BP | Building Permit | Remodel Basement & 3 Sty To Create Offices | VOID | |
| Jul 13, 1983 | 1983-014652 MP | Mechanical Permit | Remodel Basement & 3 Sty To Create Offices | VOID | |
| Jul 13, 1983 | 1983-014652 EP | Electrical Permit | Remodel Basement & 3 Sty To Create Offices | Final | |
| Mar 11, 1983 | 1983-004018 BP | Building Permit | Remodel Interior Municipal Annex Building | VOID | |
| Mar 11, 1983 | 1983-004018 MP | Mechanical Permit | Remodel Interior Municipal Annex Building | VOID | |
| Mar 11, 1983 | 1983-004018 EP | Electrical Permit | Remodel Interior Municipal Annex Building | Final | |
| Apr 13, 1982 | 1982-019862 EP | Electrical Permit | Install Ac To Comm Bldg | VOID | $1 |
| Oct 26, 1981 | 1981-013139 BP | Building Permit | Sprinklersfor Offices | Final | $59,053 |
| Sep 10, 1981 | 1981-006851 BP | Building Permit | Divide Exist Off Wtih 5/8 Sheetrock | Final | $700 |
| Sep 2, 1981 | 1981-005009 BP | Building Permit | Rem Exist Bldg To Provide For Handicapp | Final | $48,480 |
| Sep 2, 1981 | 1981-005009 MP | Mechanical Permit | Rem Exist Bldg To Provide For Handicapp | VOID | $48,480 |
| May 4, 1981 | 1981-005783 BP | Building Permit | Remodel To Create Space For Offices | Final | $2,000 |
| Jan 2, 1980 | 1980-001141 BP | Building Permit | Remove & Replace Roof Of 3 Stry Comm Bldg | Final |
| Nearest high-voltage power line | 190 ft (138 kV, Oncor Electric Delivery Co.) |
|---|---|
| Nearest pipeline | None on the state pipeline map within 2,600 ft (local gas mains are not on it) |
| Before any digging | Call 811 first; these maps are not a substitute for a locate. |
| County value | $126,326,144 |
|---|---|
| County value per sq ft | $1,098 on 115,000 sq ft |
| Median of 16 similar nearby homes | $367 per sq ft |
| This property against the median | 199.3% higher per sq ft |
| Value if set at the median | $42,205,000 ($84,121,144 lower) |
| Possible yearly tax difference | About $1,514,181 to $2,103,029 at typical Texas combined rates of 1.8% to 2.5% (check your own tax bill for your rate) |
| Comparable 1: County account 709597 | 113,656 sq ft, built 2004, $90,107,115 ($793 per sq ft) |
| Comparable 2: County account 194657 | 114,923 sq ft, built 2007, $30,170,000 ($263 per sq ft) |
| Comparable 3: County account 106565 | 113,457 sq ft, built 2007, $45,330,000 ($400 per sq ft) |
| Comparable 4: County account 104379 | 115,084 sq ft, built 2008, $37,646,535 ($327 per sq ft) |
| Comparable 5: County account 203496 | 100,800 sq ft, built 2006, $7,523,871 ($75 per sq ft) |
| Where this comes from in the tax code | Texas Tax Code section 41.43(b)(3), unequal appraisal compared with similar properties |
| Deadline | May 15, or 30 days after your notice of appraised value, whichever is later |
| Form | Form 50-132, Notice of Protest |